{"id":3234,"date":"2026-10-15T13:00:00","date_gmt":"2026-10-15T05:00:00","guid":{"rendered":"https:\/\/sourcingall.com\/?p=3234"},"modified":"2026-10-15T13:00:00","modified_gmt":"2026-10-15T05:00:00","slug":"supplier-lead-time-variability-cushion","status":"publish","type":"post","link":"https:\/\/sourcingall.com\/es\/supplier-verification\/supplier-lead-time-variability-cushion\/","title":{"rendered":"How to Use Supplier Lead-Time Variability Data in a Planning Cushion Review"},"content":{"rendered":"<h1 id=\"how-to-use-supplier-lead-time-variability-data-in-a-planning-cushion-review\">How to Use Supplier Lead-Time Variability Data in a Planning Cushion Review<\/h1>\n<p>A quoted lead time can look tidy until a buyer tries to compare it with the day material arrived, the day a <a href=\"https:\/\/sourcingall.com\/es\/how-we-work\/\">f\u00e1brica<\/a> said production finished, or the day a carrier took possession. Those are different clocks. A <strong><a href=\"https:\/\/sourcingall.com\/es\/\">proveedor<\/a> lead time variability cushion<\/strong> review begins by defining the clock and preserving actual observations before anyone converts uncertainty into an inventory, reorder, contract, or cash decision.<\/p>\n<p>A supplier lead time variability cushion is a planning concept that describes time allowance considered for uncertainty in one defined supplier flow. It can organise historical lead-time evidence, compare like-for-like observations, expose missing data, and prepare inputs for qualified review. It is not a universal buffer, safety-stock result, reorder point, order instruction, service-level choice, capacity guarantee, delivery promise, or financial recommendation.<\/p>\n<blockquote>\n<p><strong>Start with the event clock:<\/strong> a data set that mixes confirmation, production completion, carrier handoff, and receipt cannot support one clean lead-time conclusion.<\/p>\n<\/blockquote>\n<h2 id=\"table-of-contents\">Table of contents<\/h2>\n<ol>\n<li><a href=\"#what-does-a-supplier-lead-time-variability-cushion-mean\">What does a supplier lead-time variability cushion mean?<\/a><\/li>\n<li><a href=\"#which-event-clock-should-define-lead-time\">Which event clock should define lead time?<\/a><\/li>\n<li><a href=\"#what-historical-observations-should-be-preserved\">What historical observations should be preserved?<\/a><\/li>\n<li><a href=\"#how-should-observations-be-grouped-before-comparison\">How should observations be grouped before comparison?<\/a><\/li>\n<li><a href=\"#why-should-quoted-dates-and-process-metrics-remain-separate\">Why should quoted dates and process metrics remain separate?<\/a><\/li>\n<li><a href=\"#which-planning-inputs-need-qualified-review\">Which planning inputs need qualified review?<\/a><\/li>\n<li><a href=\"#which-data-gaps-require-escalation\">Which data gaps require escalation?<\/a><\/li>\n<li><a href=\"#what-are-the-limits-of-a-planning-cushion-review\">What are the limits of a planning-cushion review?<\/a><\/li>\n<li><a href=\"#frequently-asked-questions\">Frequently asked questions<\/a><\/li>\n<\/ol>\n<h2 id=\"what-does-a-supplier-lead-time-variability-cushion-mean\">What does a supplier lead-time variability cushion mean?<\/h2>\n<p>A supplier lead time variability cushion describes a time allowance considered when a defined supplier flow does not occur on a perfectly repeatable schedule. The relevant flow might be tied to an order line, SKU\/revision, supplier site, lane, purchase term, or stated handoff point. State the scope before discussing delay or buffer.<\/p>\n<p>NIST MEP says delayed materials can disrupt schedules, create work stoppages, and lead to missed customer shipments. [1] It also describes supply-chain mapping, risk assessment, safety stock, supplier metrics, and planning visibility as context-dependent activities. A supplier lead time variability cushion review supports that evidence work. It does not choose a cushion.<\/p>\n<table>\n<thead>\n<tr>\n<th>Review component<\/th>\n<th>What it can document<\/th>\n<th>What it cannot decide<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Event clock<\/td>\n<td>Start\/end events and calendar rules<\/td>\n<td>Which buffer the buyer should hold<\/td>\n<\/tr>\n<tr>\n<td>Historical observations<\/td>\n<td>Actual dates, classifications, sources, and exceptions<\/td>\n<td>Future delivery performance<\/td>\n<\/tr>\n<tr>\n<td>Grouping rules<\/td>\n<td>Which products, sites, lanes, and terms are comparable<\/td>\n<td>A causal explanation for variation<\/td>\n<\/tr>\n<tr>\n<td>Planning-input list<\/td>\n<td><a href=\"https:\/\/sourcingall.com\/es\/faqs\/\">Questions<\/a> a qualified model needs answered<\/td>\n<td>Service level, safety stock, or reorder point<\/td>\n<\/tr>\n<tr>\n<td>Exception record<\/td>\n<td>Expedites, partials, cancellations, missing data, or stated causes<\/td>\n<td>Supplier fault or contractual remedy<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>A supplier lead time variability cushion review makes uncertainty visible. The supplier lead time variability cushion record must name its clock.<\/p>\n<h2 id=\"which-event-clock-should-define-lead-time\">Which event clock should define lead time?<\/h2>\n<p>Write the start and end event in plain language. Possible records include request date\/time, supplier confirmation, material ready, production start, production finish, inspection release, carrier handoff, export\/import milestone, and receipt. The record also needs a calendar or business-day convention, time-zone treatment where applicable, supplier\/site\/lane context, and source.<\/p>\n<p>For a supplier lead time variability cushion, do not silently substitute one event for another. A \u201cquoted lead time\u201d might run from confirmation to handoff, while a buyer&#8217;s arrival <a href=\"https:\/\/sourcingall.com\/es\/about-us\/\">experience<\/a> runs from order to receipt. Both are legitimate measurements if identified. They are not the same series.<\/p>\n<table>\n<thead>\n<tr>\n<th>Clock field<\/th>\n<th>Question to record<\/th>\n<th>Common data problem<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Start event<\/td>\n<td>Does the clock begin at request, order, confirmation, or another stated milestone?<\/td>\n<td>Mixing request dates with confirmed-order dates<\/td>\n<\/tr>\n<tr>\n<td>End event<\/td>\n<td>Does it end at production completion, carrier handoff, or receipt?<\/td>\n<td>Calling a factory-finish date an arrival date<\/td>\n<\/tr>\n<tr>\n<td>Calendar rule<\/td>\n<td>Are calendar days, business days, holidays, and time zones stated?<\/td>\n<td>Subtracting dates under different conventions<\/td>\n<\/tr>\n<tr>\n<td>Flow context<\/td>\n<td>Which SKU\/revision, supplier\/site, lane, and term apply?<\/td>\n<td>Combining a different product or route without a flag<\/td>\n<\/tr>\n<tr>\n<td>Source<\/td>\n<td>Which system, document, <a href=\"https:\/\/sourcingall.com\/es\/contact-us\/\">contacto<\/a>, and retrieval date support it?<\/td>\n<td>Relying on a rebuilt spreadsheet with no source trail<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>A supplier lead time variability cushion needs one clock per comparison group.<\/p>\n<h2 id=\"what-historical-observations-should-be-preserved\">What historical observations should be preserved?<\/h2>\n<p>Preserve the original observation before analysing it. For each order line or stated shipment, record the order\/PO reference, SKU\/revision, supplier\/legal entity\/site, quantity\/unit, lane\/terms where relevant, defined timestamps, actual\/quoted\/confirmed classification, status, exception note, source\/date, missing or censored field, and later change record.<\/p>\n<table>\n<thead>\n<tr>\n<th>Observation field<\/th>\n<th>Why it belongs in the record<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Order and product reference<\/td>\n<td>Identifies the commercial and configuration scope<\/td>\n<\/tr>\n<tr>\n<td>Supplier and site<\/td>\n<td>Separates different physical production or fulfilment contexts<\/td>\n<\/tr>\n<tr>\n<td>Quantity and unit<\/td>\n<td>Shows whether observations are being compared on the same basis<\/td>\n<\/tr>\n<tr>\n<td>Clock timestamps<\/td>\n<td>Preserves the defined start and end events<\/td>\n<\/tr>\n<tr>\n<td>Classification<\/td>\n<td>Distinguishes observed actuals from quotes and confirmations<\/td>\n<\/tr>\n<tr>\n<td>Status and exception<\/td>\n<td>Separates completed, partial, cancelled, expedited, and unknown records<\/td>\n<\/tr>\n<tr>\n<td>Source, date, and gap<\/td>\n<td>Allows a reviewer to trace the record and see what is absent<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>A supplier lead time variability cushion should not replace missing dates with an average, a supplier promise, or a remembered estimate. Missing data is a finding.<\/p>\n<p>For a supplier lead time variability cushion, keep the raw event.<\/p>\n<h2 id=\"how-should-observations-be-grouped-before-comparison\">How should observations be grouped before comparison?<\/h2>\n<p>Group observations only after defining comparability. Product\/revision, supplier\/site, lane, terms, time period, quantity unit, event clock, and relevant change history may all alter the meaning of a lead-time observation. Put unlike records into separate cohorts or flag them as not comparable.<\/p>\n<p>NIST&#8217;s smart-manufacturing work describes the difficulty of attributing effects in complex systems and says production and supply networks must cope with uncertainty and abnormal events. [2] A supplier lead time variability cushion review should therefore retain abnormal-event notes rather than delete inconvenient records to create a cleaner number.<\/p>\n<table>\n<thead>\n<tr>\n<th>Grouping question<\/th>\n<th>Example of a safe record<\/th>\n<th>Why it matters<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Product\/revision<\/td>\n<td>Named SKU and controlled revision<\/td>\n<td>Design or input changes can alter the flow<\/td>\n<\/tr>\n<tr>\n<td>Supplier\/site<\/td>\n<td>Legal entity and physical source<\/td>\n<td>A supplier group may use more than one site<\/td>\n<\/tr>\n<tr>\n<td>Lane\/terms<\/td>\n<td>Stated route\/handoff and purchase-term context<\/td>\n<td>The same factory can feed different clocks<\/td>\n<\/tr>\n<tr>\n<td>Period<\/td>\n<td>Defined observation window and known calendar events<\/td>\n<td>Older records may not describe the current flow<\/td>\n<\/tr>\n<tr>\n<td>Status<\/td>\n<td>Completed, partial, cancelled, expedited, or unknown<\/td>\n<td>Removing exceptions can change the story<\/td>\n<\/tr>\n<tr>\n<td>Change record<\/td>\n<td>Material, capacity, route, process, or agreement change<\/td>\n<td>A prior series may not apply after change<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>A supplier lead time variability cushion needs comparable evidence before a qualified analyst models it. The supplier lead time variability cushion file should preserve changes.<\/p>\n<h2 id=\"why-should-quoted-dates-and-process-metrics-remain-separate\">Why should quoted dates and process metrics remain separate?<\/h2>\n<p>A <a href=\"https:\/\/sourcingall.com\/es\/get-a-quote\/\">cita<\/a> is a supplier statement. A confirmation is another stated commitment. An actual observed time is a dated event record under a defined clock. Process metrics such as stated line capacity or OEE describe a different operating context. None of those records automatically converts into a supplier lead-time cushion.<\/p>\n<p>NIST MEP notes that supplier metrics and supply-chain visibility can support planning, while total-cost review extends beyond purchase price to longer lead times, inventory, freight, tariffs, and other factors. [1] A supplier lead time variability cushion review should retain these categories separately instead of using one process metric to assert a delivery allowance.<\/p>\n<table>\n<thead>\n<tr>\n<th>Data type<\/th>\n<th>What it describes<\/th>\n<th>Boundary<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Quoted date\/time<\/td>\n<td>Supplier-provided expectation<\/td>\n<td>It is not an actual performance observation<\/td>\n<\/tr>\n<tr>\n<td>Confirmed date\/time<\/td>\n<td>Stated commitment at a defined point<\/td>\n<td>It is not proof that a later event occurred<\/td>\n<\/tr>\n<tr>\n<td>Actual event time<\/td>\n<td>Documented milestone under a defined clock<\/td>\n<td>It may not represent a different SKU, site, or route<\/td>\n<\/tr>\n<tr>\n<td>Process metric<\/td>\n<td>A stated production or equipment measure<\/td>\n<td>It is not a delivery or inventory input by itself<\/td>\n<\/tr>\n<tr>\n<td>Inventory record<\/td>\n<td>Current stated stock\/location\/status<\/td>\n<td>It does not select a future stock policy<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>A supplier lead time variability cushion does not emerge from one number.<\/p>\n<h2 id=\"which-planning-inputs-need-qualified-review\">Which planning inputs need qualified review?<\/h2>\n<p>A qualified inventory or operations <a href=\"https:\/\/sourcingall.com\/es\/articles\/\">an\u00e1lisis<\/a> needs more than a lead-time list. Its inputs may include product criticality, demand history and source, observation and grouping rules, lead-time distribution assumptions, service objective, usable inventory and location, order\/lot constraints, expiry\/obsolescence, demand and lead-time relationship, supplier\/site\/lane, storage\/cash\/write-off effects, policy\/review cycle, and legal or contractual constraints.<\/p>\n<p>The 2025 MIT thesis on medical-device safety-stock modelling discusses component lead times, data visibility, forecasting, service targets, and inventory models in a particular context. [3] It does not provide a universal formula for another buyer or product. A supplier lead time variability cushion article should state the inputs and leave the decision to qualified supply-chain, inventory, finance, accounting, procurement, logistics, commercial, and legal reviewers.<\/p>\n<table>\n<thead>\n<tr>\n<th>Required model input<\/th>\n<th>Question to resolve<\/th>\n<th>Why generic advice fails<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Demand evidence<\/td>\n<td>Which demand records and dates apply?<\/td>\n<td>Different demand patterns change the planning question<\/td>\n<\/tr>\n<tr>\n<td>Service objective<\/td>\n<td>Which product\/customer outcome is being measured?<\/td>\n<td>There is no universal service target<\/td>\n<\/tr>\n<tr>\n<td>Usable inventory<\/td>\n<td>Which stock is available, where, and under what constraint?<\/td>\n<td>On-hand quantity may not be usable stock<\/td>\n<\/tr>\n<tr>\n<td>Supplier-flow evidence<\/td>\n<td>Which actual observations are comparable?<\/td>\n<td>Mixed clocks or sites distort the input<\/td>\n<\/tr>\n<tr>\n<td>Financial and operational constraints<\/td>\n<td>What storage, cash, expiry, contract, and review limits apply?<\/td>\n<td>A buffer can have effects beyond availability<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>A supplier lead time variability cushion is a review input, not an order instruction.<\/p>\n<h2 id=\"which-data-gaps-require-escalation\">Which data gaps require escalation?<\/h2>\n<table>\n<thead>\n<tr>\n<th>Gap<\/th>\n<th>Why it matters<\/th>\n<th>Safer response<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Start or end clock is unclear<\/td>\n<td>An elapsed-time calculation lacks a definition<\/td>\n<td>Rebuild the event map before analysis<\/td>\n<\/tr>\n<tr>\n<td>Actuals are mixed with quotes or confirmations<\/td>\n<td>The series combines different kinds of evidence<\/td>\n<td>Classify records separately<\/td>\n<\/tr>\n<tr>\n<td>Product, site, lane, or terms changed<\/td>\n<td>Earlier observations may not apply<\/td>\n<td>Create cohorts and preserve the change record<\/td>\n<\/tr>\n<tr>\n<td>Partials, expedites, cancellations, or missing records are ignored<\/td>\n<td>The data may overstate stability<\/td>\n<td>Retain status and missing-data fields<\/td>\n<\/tr>\n<tr>\n<td>Source\/date cannot be traced<\/td>\n<td>A reviewer cannot assess evidence <a href=\"https:\/\/sourcingall.com\/es\/services\/\">calidad<\/a><\/td>\n<td>Locate original records or mark the gap<\/td>\n<\/tr>\n<tr>\n<td>Reorder, stock, payment, contract, or supplier action is proposed<\/td>\n<td>It requires decision-specific advice<\/td>\n<td>Obtain qualified professional review before action<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>A supplier lead time variability cushion review can flag uncertainty without accusing a supplier or directing a purchase decision.<\/p>\n<p>Escalate before action.<\/p>\n<h2 id=\"what-are-the-limits-of-a-planning-cushion-review\">What are the limits of a planning-cushion review?<\/h2>\n<p>This evidence framework can define clocks, organise observations, separate data types, and identify the inputs that a qualified model would require. It cannot calculate or prescribe a buffer, safety stock, reorder point, service level, supplier capacity, delivery date, order quantity, payment, contract term, commercial remedy, or financial outcome.<\/p>\n<p>Supplier lead time variability cushion content is general operations education, not supply-chain, inventory, finance, accounting, tax, legal, purchasing, customs, logistics, insurance, commercial, product, or safety advice. Use qualified professionals for any action involving stock, orders, cash, contracts, supplier commitments, or customer delivery.<\/p>\n<p>The model needs facts.<\/p>\n<h2 id=\"frequently-asked-questions\">Frequently asked questions<\/h2>\n<h3 id=\"what-is-a-supplier-lead-time-variability-cushion\">What is a supplier lead time variability cushion?<\/h3>\n<p>A supplier lead time variability cushion is a planning concept for considering uncertainty in a defined supplier flow. It is not a universal buffer number or an instruction to purchase or hold stock.<\/p>\n<h3 id=\"what-dates-should-define-supplier-lead-time\">What dates should define supplier lead time?<\/h3>\n<p>Use a stated start and end event, such as confirmation and carrier handoff or order and receipt, plus the calendar convention, product, site, lane, terms, source, and date. Do not mix clocks.<\/p>\n<h3 id=\"can-i-compare-a-quoted-date-with-an-actual-receipt-date\">Can I compare a quoted date with an actual receipt date?<\/h3>\n<p>You can preserve both records, but label them differently. A quote is a statement; receipt is an observed end event under a defined clock.<\/p>\n<h3 id=\"can-oee-be-converted-into-a-delivery-buffer\">Can OEE be converted into a delivery buffer?<\/h3>\n<p>No. OEE or another process metric has a different scope from a defined supplier delivery record. It cannot create a delivery cushion by itself.<\/p>\n<h3 id=\"why-separate-partial-and-expedited-shipments\">Why separate partial and expedited shipments?<\/h3>\n<p>They can alter what the elapsed time represents. Keep their status and exception notes instead of treating them as ordinary completed observations.<\/p>\n<h3 id=\"what-should-a-lead-time-observation-include\">What should a lead-time observation include?<\/h3>\n<p>Retain the order reference, SKU\/revision, supplier\/site, quantity\/unit, clock timestamps, lane\/terms where relevant, classification, status, exception, source\/date, and missing-data field.<\/p>\n<h3 id=\"is-a-bigger-cushion-always-safer\">Is a bigger cushion always safer?<\/h3>\n<p>This article does not choose a cushion. Inventory planning also depends on demand, usable stock, cash, storage, expiry, service objective, and other product-specific constraints.<\/p>\n<h3 id=\"when-should-i-create-a-new-comparison-group\">When should I create a new comparison group?<\/h3>\n<p>Create a separate group when product\/revision, supplier\/site, lane, terms, event clock, period, quantity basis, or material flow changes the meaning of the observation.<\/p>\n<h3 id=\"can-this-review-set-a-reorder-point\">Can this review set a reorder point?<\/h3>\n<p>No. A reorder point is an action decision that requires qualified inventory, supply-chain, commercial, financial, and operational analysis using defined inputs.<\/p>\n<h3 id=\"what-should-trigger-escalation\">What should trigger escalation?<\/h3>\n<p>Escalate unclear clocks, mixed data types, untraceable sources, changed supplier flows, ignored exceptions, missing records, and any proposed inventory, ordering, payment, contract, or supplier decision.<\/p>\n<h2 id=\"references\">Referencias<\/h2>\n<p>[1] <a href=\"https:\/\/www.nist.gov\/mep\/supply-chain\" target=\"_blank\" rel=\"noopener\">NIST MEP, Supply Chain Management<\/a><\/p>\n<p>[2] <a href=\"https:\/\/www.nist.gov\/programs-projects\/smart-manufacturing-operations-planning-and-control-program\" target=\"_blank\" rel=\"noopener\">NIST, Smart Manufacturing Operations Planning and Control<\/a><\/p>\n<p>[3] <a href=\"https:\/\/dspace.mit.edu\/entities\/publication\/1919d095-ab6b-42a0-9f80-84480ab899cf\" target=\"_blank\" rel=\"noopener\">MIT, Safety Stock Modeling for a Medical Devices Supply Chain<\/a><\/p>\n<h2 id=\"related-reading\">Related reading<\/h2>\n<p>Continue with <a href=\"https:\/\/sourcingall.com\/es\/supplier-production-capacity-verification\/\">supplier production capacity verification<\/a>, <a href=\"https:\/\/sourcingall.com\/es\/calculate-factory-takt-time\/\">calculate factory takt time<\/a>, <a href=\"https:\/\/sourcingall.com\/es\/production-ramp-up-plan-template\/\">production ramp up plan template<\/a>, <a href=\"https:\/\/sourcingall.com\/es\/split-tooling-across-factories\/\">split tooling across factories<\/a>, and <a href=\"https:\/\/sourcingall.com\/es\/smt-line-capacity-check\/\">SMT line capacity check<\/a>.<\/p>","protected":false},"excerpt":{"rendered":"<p>Use a supplier lead time variability cushion review to define clocks, preserve actual observations, separate data types, and expose planning limits.<\/p>","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"rank_math_internal_links_processed":["1"],"_uag_page_assets":["a:9:{s:3:\"css\";s:0:\"\";s:2:\"js\";s:0:\"\";s:18:\"current_block_list\";a:15:{i:0;s:11:\"core\/search\";i:1;s:10:\"core\/group\";i:2;s:12:\"core\/heading\";i:3;s:17:\"core\/latest-posts\";i:4;s:20:\"core\/latest-comments\";i:5;s:13:\"core\/archives\";i:6;s:15:\"core\/categories\";i:8;s:25:\"greenshift-blocks\/heading\";i:9;s:22:\"greenshift-blocks\/text\";i:10;s:14:\"core\/paragraph\";i:12;s:18:\"core\/legacy-widget\";i:13;s:17:\"core\/social-links\";i:15;s:16:\"core\/social-link\";i:16;s:21:\"trp\/language-switcher\";i:17;s:9:\"core\/html\";}s:8:\"uag_flag\";b:0;s:11:\"uag_version\";s:10:\"1792198814\";s:6:\"gfonts\";a:0:{}s:10:\"gfonts_url\";s:0:\"\";s:12:\"gfonts_files\";a:0:{}s:14:\"uag_faq_layout\";b:0;}"]},"categories":[33],"tags":[],"class_list":["post-3234","post","type-post","status-publish","format-standard","hentry","category-supplier-verification"],"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"trp-custom-language-flag":false},"uagb_author_info":{"display_name":"admin","author_link":"https:\/\/sourcingall.com\/es\/author\/admin\/"},"uagb_comment_info":0,"uagb_excerpt":"Use a supplier lead time variability cushion review to define clocks, preserve actual observations, separate data types, and expose planning limits.","_links":{"self":[{"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/posts\/3234","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/comments?post=3234"}],"version-history":[{"count":1,"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/posts\/3234\/revisions"}],"predecessor-version":[{"id":3461,"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/posts\/3234\/revisions\/3461"}],"wp:attachment":[{"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/media?parent=3234"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/categories?post=3234"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/tags?post=3234"}],"curies":[{"name":"gracias","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}