{"id":3233,"date":"2026-10-15T09:00:00","date_gmt":"2026-10-15T01:00:00","guid":{"rendered":"https:\/\/sourcingall.com\/?p=3233"},"modified":"2026-10-15T09:00:00","modified_gmt":"2026-10-15T01:00:00","slug":"smt-line-capacity-check","status":"publish","type":"post","link":"https:\/\/sourcingall.com\/es\/supplier-verification\/smt-line-capacity-check\/","title":{"rendered":"How to Verify an EMS Supplier&#8217;s SMT Line Capacity and Soldering Process Before PCB Mass Production"},"content":{"rendered":"<h1 id=\"how-to-verify-an-ems-suppliers-smt-line-capacity-and-soldering-process-before-pcb-mass-production\">How to Verify an EMS Supplier&#8217;s SMT Line Capacity and Soldering Process Before PCB Mass Production<\/h1>\n<p>A factory tour can show a row of placement machines, a reflow oven, and a busy screen. It rarely shows which PCB revision, component set, setup, inspection method, output definition, or record belongs to your assembly. An <strong>SMT line capacity check<\/strong> deber\u00eda <a href=\"https:\/\/sourcingall.com\/es\/contact-us\/\">conectar<\/a> the supplier&#8217;s line claim to a named board, product revision, process record, evidence source, and date.<\/p>\n<p>An SMT line capacity check is a product-specific review that identifies the EMS supplier&#8217;s stated site, line <a href=\"https:\/\/sourcingall.com\/es\/articles\/\">recursos<\/a>, inputs, process context, inspection\/measurement records, output definitions, changes, and limits. It is not proof of placement rate, soldering <a href=\"https:\/\/sourcingall.com\/es\/how-we-work\/\">calidad<\/a>, reflow profile adequacy, capacity, delivery, product compliance, or future assembly performance.<\/p>\n<blockquote>\n<p><strong>Start with the board record:<\/strong> a line claim has little meaning until it identifies the PCB\/assembly revision, BOM, resources, quality basis, source, date, and missing information.<\/p>\n<\/blockquote>\n<h2 id=\"table-of-contents\">Table of contents<\/h2>\n<ol>\n<li><a href=\"#what-does-an-smt-line-capacity-check-examine\">What does an SMT line capacity check examine?<\/a><\/li>\n<li><a href=\"#why-is-a-placement-rate-claim-not-enough\">Why is a placement-rate claim not enough?<\/a><\/li>\n<li><a href=\"#which-records-should-define-the-line-and-assembly\">Which records should define the line and assembly?<\/a><\/li>\n<li><a href=\"#what-evidence-should-an-ems-supplier-provide\">What evidence should an EMS supplier provide?<\/a><\/li>\n<li><a href=\"#what-can-a-remote-tour-actually-show\">What can a remote tour actually show?<\/a><\/li>\n<li><a href=\"#how-should-inspection-and-measurement-records-be-read\">How should inspection and measurement records be read?<\/a><\/li>\n<li><a href=\"#how-should-output-and-change-records-be-kept\">How should output and change records be kept?<\/a><\/li>\n<li><a href=\"#which-gaps-require-escalation\">Which gaps require escalation?<\/a><\/li>\n<li><a href=\"#what-are-the-limits-of-an-smt-line-capacity-check\">What are the limits of an SMT line capacity check?<\/a><\/li>\n<li><a href=\"#frequently-asked-questions\">Frequently asked questions<\/a><\/li>\n<\/ol>\n<h2 id=\"what-does-an-smt-line-capacity-check-examine\">What does an SMT line capacity check examine?<\/h2>\n<p>An SMT line capacity check reviews the evidence around a stated PCB assembly. Record the buyer and <a href=\"https:\/\/sourcingall.com\/es\/\">proveedor<\/a> legal entities, factory\/site, PCB\/assembly\/BOM\/revision, component and input references, named line\/equipment\/fixture\/program context, setup\/change\/maintenance status, lot\/run\/output definitions, inspection\/test\/measurement evidence, source\/date, and limitations.<\/p>\n<p>NIST describes manufacturing monitoring as harder when equipment wears, process complexity rises, and production systems are reconfigured for changing products. [1] An SMT line capacity check should therefore connect a claimed line to the actual board and operating context instead of treating the line name as a blanket capability statement.<\/p>\n<table>\n<thead>\n<tr>\n<th>Review subject<\/th>\n<th>What the record can show<\/th>\n<th>What it cannot prove alone<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>PCB\/assembly revision<\/td>\n<td>The defined board and BOM context<\/td>\n<td>Product compliance or future quality<\/td>\n<\/tr>\n<tr>\n<td>Line\/equipment record<\/td>\n<td>A supplier-stated resource, asset, and configuration<\/td>\n<td>Actual throughput or availability<\/td>\n<\/tr>\n<tr>\n<td>Process record<\/td>\n<td>Stated product\/program\/recipe context<\/td>\n<td>Correct settings or solder-joint result<\/td>\n<\/tr>\n<tr>\n<td>Output record<\/td>\n<td>Defined started, completed, accepted, reworked, rejected, or held units<\/td>\n<td>A comparable yield without a stated denominator<\/td>\n<\/tr>\n<tr>\n<td>Inspection evidence<\/td>\n<td>Named sample\/lot\/method\/equipment\/result<\/td>\n<td>That every later board will perform the same<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>An SMT line capacity check is an evidence map, not a production release.<\/p>\n<h2 id=\"why-is-a-placement-rate-claim-not-enough\">Why is a placement-rate claim not enough?<\/h2>\n<p>A placement rate has no clear buyer meaning without the board revision, component mix, feeder\/setup state, line configuration, product program, inspection scope, output unit, quality status, source, and time basis. It can describe a supplier&#8217;s statement, but not a promised accepted output or shipment date.<\/p>\n<p>Para <strong>SMT line capacity check<\/strong> work, separate the machine&#8217;s stated figure from the product-specific claim. The unit may refer to a theoretical machine value, a board-level run, a placement count, a started quantity, or another basis. Unless the supplier defines it, do not convert it into capacity or delivery planning.<\/p>\n<p>A number needs its denominator.<\/p>\n<h2 id=\"which-records-should-define-the-line-and-assembly\">Which records should define the line and assembly?<\/h2>\n<p>Make a comparison file that binds the board to the resource and evidence. Every item needs a source\/date and a clear same, different, unknown, or not-comparable status where multiple runs or lines are involved.<\/p>\n<table>\n<thead>\n<tr>\n<th>Record<\/th>\n<th>What to identify<\/th>\n<th>Why it matters<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Board definition<\/td>\n<td>PCB\/assembly\/BOM\/revision, approved product requirement<\/td>\n<td>Prevents <a href=\"https:\/\/sourcingall.com\/es\/case-studies\/\">resultados<\/a> from a prior revision being reused<\/td>\n<\/tr>\n<tr>\n<td>Factory and line<\/td>\n<td>Legal entity, site, named line\/resource\/asset record<\/td>\n<td>Supplier groups may operate more than one site<\/td>\n<\/tr>\n<tr>\n<td>Inputs<\/td>\n<td>PCB, components, solder\/paste\/consumable records and lot context when supplied<\/td>\n<td>Similar board names can hide different inputs<\/td>\n<\/tr>\n<tr>\n<td>Program\/process<\/td>\n<td>Product-program or recipe reference at agreed scope<\/td>\n<td>A displayed screen does not validate the process<\/td>\n<\/tr>\n<tr>\n<td>Fixtures and handling<\/td>\n<td>Stated fixture\/tool\/configuration\/maintenance\/change context<\/td>\n<td>Setup differences can limit comparison<\/td>\n<\/tr>\n<tr>\n<td>Output and quality<\/td>\n<td>Run\/lot, units, status categories, inspection\/test link<\/td>\n<td>\u201cYield\u201d has no meaning without a defined basis<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>An SMT line capacity check should keep process records separate from assertions <a href=\"https:\/\/sourcingall.com\/es\/about-us\/\">acerca de<\/a> product safety, compliance, or contract performance.<\/p>\n<p>Scope comes first.<\/p>\n<h2 id=\"what-evidence-should-an-ems-supplier-provide\">What evidence should an EMS supplier provide?<\/h2>\n<p><a href=\"https:\/\/sourcingall.com\/es\/get-a-quote\/\">Request<\/a> proportionate records, not a staged demonstration. An evidence file can contain the equipment register or asset record, nameplate record where available, line\/process map, PCB\/assembly revision and BOM reference, program\/recipe reference at the agreed level, component\/PCB\/solder\/paste\/consumable records, setup\/change\/maintenance status, lot\/run\/output entries, reflow\/process record, inspection\/test\/measurement record, deviation\/rework\/reject\/hold log, stated readiness or capacity information, and source\/date\/data owner.<\/p>\n<table>\n<thead>\n<tr>\n<th>Evidence item<\/th>\n<th>What it can show<\/th>\n<th>Boundary<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Line or asset record<\/td>\n<td>Supplier-stated equipment\/site context<\/td>\n<td>It does not promise capacity or delivery<\/td>\n<\/tr>\n<tr>\n<td>Board\/BOM record<\/td>\n<td>Product configuration linked to the run<\/td>\n<td>It does not validate inputs or product approval<\/td>\n<\/tr>\n<tr>\n<td>Reflow\/process record<\/td>\n<td>Stated record tied to a product, line, and time<\/td>\n<td>It does not independently prove solder quality<\/td>\n<\/tr>\n<tr>\n<td>Inspection\/test record<\/td>\n<td>Requirement, sample\/lot, method\/equipment, result, source\/date<\/td>\n<td>It does not certify all later units<\/td>\n<\/tr>\n<tr>\n<td>Output log<\/td>\n<td>Defined statuses over a stated period or run<\/td>\n<td>It does not establish a comparable yield by itself<\/td>\n<\/tr>\n<tr>\n<td>Change\/deviation record<\/td>\n<td>What the supplier recorded as changed or unresolved<\/td>\n<td>It does not determine technical impact<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>For an SMT line capacity check, original or durable source records are more useful than a summary slide. Preserve missing evidence rather than filling it with a generic benchmark.<\/p>\n<p>Evidence needs a source.<\/p>\n<h2 id=\"what-can-a-remote-tour-actually-show\">What can a remote tour actually show?<\/h2>\n<p>A remote tour can show limited visible facts: a stated facility or line, accessible asset markings, a fixture or board visible at the time, a displayed record, the person providing the walkthrough, and the source\/date. It cannot validate hidden program settings, placement rate, oven outcome, solder-joint quality, calibration, capacity, safety, compliance, or later performance.<\/p>\n<p>An SMT line capacity check should not ask a factory to bypass safeguarding, run an unqualified test, expose proprietary screens, or interrupt controlled production just to provide proof. A remote observation should be logged as an observation, with its scope and limitations.<\/p>\n<p>Video has a boundary.<\/p>\n<h2 id=\"how-should-inspection-and-measurement-records-be-read\">How should inspection and measurement records be read?<\/h2>\n<p>NIST defines metrological traceability as a documented, unbroken calibration chain to a specified reference. NIST also says traceability alone does not guarantee fitness for purpose, and the provider is responsible for supporting its own claim. [2] For a buyer, a calibration label or certificate is therefore not a product-quality conclusion.<\/p>\n<p>NIST also says measurement equipment is a principal source of dimensional uncertainty and that uncertainty sources should be articulated and shared. [3] An SMT line capacity check should connect each inspection or test statement to a product requirement, board\/assembly revision, sample\/lot, method, equipment, reference or traceability claim, result, date, source, and reported limits.<\/p>\n<table>\n<thead>\n<tr>\n<th>Quality record<\/th>\n<th><a href=\"https:\/\/sourcingall.com\/es\/faqs\/\">Questions<\/a> to ask<\/th>\n<th>What not to infer<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Requisito<\/td>\n<td>Which revision and acceptance basis apply?<\/td>\n<td>That the requirement covers every risk<\/td>\n<\/tr>\n<tr>\n<td>Sample\/lot<\/td>\n<td>Which boards or lot does this evidence cover?<\/td>\n<td>That one result represents all production<\/td>\n<\/tr>\n<tr>\n<td>Method\/equipment<\/td>\n<td>What method\/equipment and recorded context were used?<\/td>\n<td>That a method label proves measurement fitness<\/td>\n<\/tr>\n<tr>\n<td>Result\/status<\/td>\n<td>What was observed, reworked, rejected, held, or unresolved?<\/td>\n<td>That \u201cpass\u201d means capacity or compliance<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>An SMT line capacity check needs an identified measurement basis.<\/p>\n<h2 id=\"how-should-output-and-change-records-be-kept\">How should output and change records be kept?<\/h2>\n<p>Keep output categories separate. A log can distinguish started, completed, accepted, reworked, rejected, held, or otherwise defined units, with the product revision, run\/lot, source\/date, and responsible record owner. Do not calculate or compare yield when the denominator, period, quality status, or board revision is unclear.<\/p>\n<p>Record changes to the PCB, BOM, component, paste\/consumable, program, line, fixture, inspection method, packaging, or resource with old\/new state, source\/date, affected lots, linked evidence, limitation, and next qualified review. An SMT line capacity check should be repeated or rescoped when these changes affect the claim being assessed.<\/p>\n<table>\n<thead>\n<tr>\n<th>Change field<\/th>\n<th>Record<\/th>\n<th>Reason<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Scope<\/td>\n<td>Product\/line\/asset\/process\/input\/inspection reference<\/td>\n<td>Shows what changed<\/td>\n<\/tr>\n<tr>\n<td>Momento<\/td>\n<td>Reported date and affected run\/lot<\/td>\n<td>Prevents a result being assigned to the wrong period<\/td>\n<\/tr>\n<tr>\n<td>Evidence<\/td>\n<td>Original log, source, and linked quality data<\/td>\n<td>Allows later reviewers to trace the statement<\/td>\n<\/tr>\n<tr>\n<td>Open action<\/td>\n<td>Stated unresolved item and decision owner<\/td>\n<td>Keeps uncertainty visible<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>A change record does not state its own effect.<\/p>\n<h2 id=\"which-gaps-require-escalation\">Which gaps require escalation?<\/h2>\n<table>\n<thead>\n<tr>\n<th>Gap<\/th>\n<th>Why it matters<\/th>\n<th>Safer response<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Site, line, or resource is unnamed<\/td>\n<td>The claim cannot be linked to a defined operation<\/td>\n<td>Request an identified source record<\/td>\n<\/tr>\n<tr>\n<td>Board or BOM revision differs<\/td>\n<td>Process or quality evidence may not apply<\/td>\n<td>Reconcile the product definition before comparison<\/td>\n<\/tr>\n<tr>\n<td>Output\/yield has no denominator<\/td>\n<td>The stated figure cannot be interpreted<\/td>\n<td>Record the missing basis; do not calculate one<\/td>\n<\/tr>\n<tr>\n<td>Reflow or inspection evidence lacks product\/line\/time link<\/td>\n<td>The result has uncertain scope<\/td>\n<td>Request source context and qualified review<\/td>\n<\/tr>\n<tr>\n<td>Traceability claim is treated as product fitness<\/td>\n<td>Measurement traceability has a limited meaning<\/td>\n<td>Assess the specific claim and decision requirement<\/td>\n<\/tr>\n<tr>\n<td>Rework\/reject\/hold data is mixed or omitted<\/td>\n<td>Output status can be overstated<\/td>\n<td>Separate categories and retain limitations<\/td>\n<\/tr>\n<tr>\n<td>Capacity, delivery, price, payment, contract, or remedy issue arises<\/td>\n<td>It exceeds an evidence review<\/td>\n<td>Obtain qualified commercial and legal advice<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>An SMT line capacity check cannot resolve a technical or commercial conflict. It can record the gap clearly.<\/p>\n<p>Gaps need a record.<\/p>\n<h2 id=\"what-are-the-limits-of-an-smt-line-capacity-check\">What are the limits of an SMT line capacity check?<\/h2>\n<p>An evidence check can organise records around a stated EMS line and assembly. It cannot select a line, set a soldering profile, prescribe process values, validate equipment, certify calibration, establish safety, approve a PCB, predict yield, guarantee capacity\/delivery, prove compliance, choose a supplier, or decide payment, contract, rights, or remedy.<\/p>\n<p>SMT line capacity check <a href=\"https:\/\/sourcingall.com\/es\/services\/\">guidance<\/a> is general sourcing-operations education, not PCB\/EMS\/process engineering, soldering, product safety\/compliance, metrology\/calibration, quality, legal, China-law, financial, tax, logistics, procurement, or commercial advice. Use qualified technical, quality, product, commercial, and legal advisers for a real production decision.<\/p>\n<p>The evidence has limits.<\/p>\n<h2 id=\"frequently-asked-questions\">Frequently asked questions<\/h2>\n<h3 id=\"what-is-an-smt-line-capacity-check\">What is an SMT line capacity check?<\/h3>\n<p>An SMT line capacity check is a product-specific review of a stated EMS site, line resources, assembly revision, process\/inspection evidence, output definitions, changes, and gaps. It does not prove throughput, quality, capacity, or delivery.<\/p>\n<h3 id=\"does-a-stated-placement-rate-prove-production-capacity\">Does a stated placement rate prove production capacity?<\/h3>\n<p>No. The claim needs a defined board, component mix, setup, line, output unit, quality status, time basis, source, and limitation before it can be interpreted.<\/p>\n<h3 id=\"what-line-records-should-i-ask-for\">What line records should I ask for?<\/h3>\n<p>Request identified equipment\/line records, assembly\/BOM revision, process context, inputs, output status, inspection\/test evidence, changes, sources, dates, and stated limitations.<\/p>\n<h3 id=\"can-a-remote-tour-prove-soldering-quality\">Can a remote tour prove soldering quality?<\/h3>\n<p>No. It can show limited visible facts. It cannot validate hidden programs, reflow outcome, joint quality, calibration, capacity, safety, or future production performance.<\/p>\n<h3 id=\"what-does-a-reflow-record-prove\">What does a reflow record prove?<\/h3>\n<p>A reflow record can document a supplier-stated process record for a named product\/line\/time context. It does not independently prove solder-joint quality or product approval.<\/p>\n<h3 id=\"does-a-calibration-certificate-approve-an-assembly\">Does a calibration certificate approve an assembly?<\/h3>\n<p>No. Traceability or calibration evidence needs the specific equipment, measurement, reference, date, uncertainty, product requirement, sample, and method context. It does not guarantee fitness for purpose.<\/p>\n<h3 id=\"why-define-accepted-reworked-rejected-and-held-units-separately\">Why define accepted, reworked, rejected, and held units separately?<\/h3>\n<p>Those categories have different meanings. Without a defined denominator and status rules, an output or yield claim cannot be compared reliably.<\/p>\n<h3 id=\"what-should-trigger-a-repeat-review\">What should trigger a repeat review?<\/h3>\n<p>Repeat or rescope an SMT line capacity check when PCB\/BOM, components, line, program, fixture, paste, process, inspection method, output definition, or production site changes the evidence scope.<\/p>\n<h3 id=\"when-should-i-escalate\">When should I escalate?<\/h3>\n<p>Escalate missing line\/board identity, mixed revisions, absent output basis, unsupported quality claims, unclear measurement records, hidden change status, and any capacity, delivery, payment, contract, or remedy decision.<\/p>\n<h3 id=\"does-this-article-approve-an-ems-supplier\">Does this article approve an EMS supplier?<\/h3>\n<p>No. It provides a framework for evidence review. Supplier qualification and production release require qualified technical, quality, product, commercial, and legal review.<\/p>\n<h2 id=\"references\">Referencias<\/h2>\n<p>[1] <a href=\"https:\/\/www.nist.gov\/programs-projects\/monitoring-diagnostics-and-prognostics-manufacturing-operations\" target=\"_blank\" rel=\"noopener\">NIST, Monitoring, Diagnostics and Prognostics for Manufacturing Operations<\/a><\/p>\n<p>[2] <a href=\"https:\/\/www.nist.gov\/metrology\/metrological-traceability\" target=\"_blank\" rel=\"noopener\">NIST, Metrological Traceability: Frequently Asked Questions and NIST Policy<\/a><\/p>\n<p>[3] <a href=\"https:\/\/www.nist.gov\/publications\/rule-model-selecting-dimensional-measurement-equipment-inspection-planning\" target=\"_blank\" rel=\"noopener\">NIST, Rule Model for Selecting Dimensional Measurement Equipment in Inspection Planning<\/a><\/p>\n<h2 id=\"related-reading\">Related reading<\/h2>\n<p>Continue with <a href=\"https:\/\/sourcingall.com\/es\/verify-pilot-run-machine-suitability\/\">verify pilot run machine suitability<\/a>, <a href=\"https:\/\/sourcingall.com\/es\/remote-labeling-line-audit\/\">remote labeling line audit<\/a>, <a href=\"https:\/\/sourcingall.com\/es\/accredited-testing-laboratory-selection\/\">accredited testing laboratory selection<\/a>, <a href=\"https:\/\/sourcingall.com\/es\/product-retention-samples-program\/\">product retention samples program<\/a>, and <a href=\"https:\/\/sourcingall.com\/es\/production-ramp-up-plan-template\/\">production ramp up plan template<\/a>.<\/p>","protected":false},"excerpt":{"rendered":"<p>Use an SMT line capacity check to review EMS line records, process evidence, measurement context, output definitions, changes, and limits.<\/p>","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"rank_math_internal_links_processed":["1"],"_uag_page_assets":["a:9:{s:3:\"css\";s:0:\"\";s:2:\"js\";s:0:\"\";s:18:\"current_block_list\";a:15:{i:0;s:11:\"core\/search\";i:1;s:10:\"core\/group\";i:2;s:12:\"core\/heading\";i:3;s:17:\"core\/latest-posts\";i:4;s:20:\"core\/latest-comments\";i:5;s:13:\"core\/archives\";i:6;s:15:\"core\/categories\";i:8;s:25:\"greenshift-blocks\/heading\";i:9;s:22:\"greenshift-blocks\/text\";i:10;s:14:\"core\/paragraph\";i:12;s:18:\"core\/legacy-widget\";i:13;s:17:\"core\/social-links\";i:15;s:16:\"core\/social-link\";i:16;s:21:\"trp\/language-switcher\";i:17;s:9:\"core\/html\";}s:8:\"uag_flag\";b:0;s:11:\"uag_version\";s:10:\"1792198814\";s:6:\"gfonts\";a:0:{}s:10:\"gfonts_url\";s:0:\"\";s:12:\"gfonts_files\";a:0:{}s:14:\"uag_faq_layout\";b:0;}"]},"categories":[33],"tags":[],"class_list":["post-3233","post","type-post","status-publish","format-standard","hentry","category-supplier-verification"],"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"trp-custom-language-flag":false},"uagb_author_info":{"display_name":"admin","author_link":"https:\/\/sourcingall.com\/es\/author\/admin\/"},"uagb_comment_info":0,"uagb_excerpt":"Use an SMT line capacity check to review EMS line records, process evidence, measurement context, output definitions, changes, and limits.","_links":{"self":[{"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/posts\/3233","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/comments?post=3233"}],"version-history":[{"count":1,"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/posts\/3233\/revisions"}],"predecessor-version":[{"id":3460,"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/posts\/3233\/revisions\/3460"}],"wp:attachment":[{"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/media?parent=3233"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/categories?post=3233"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/tags?post=3233"}],"curies":[{"name":"gracias","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}