{"id":3150,"date":"2026-09-18T17:00:00","date_gmt":"2026-09-18T09:00:00","guid":{"rendered":"https:\/\/sourcingall.com\/?p=3150"},"modified":"2026-09-18T17:00:00","modified_gmt":"2026-09-18T09:00:00","slug":"use-idle-capacity-reduce-moq","status":"publish","type":"post","link":"https:\/\/sourcingall.com\/es\/supplier-verification\/use-idle-capacity-reduce-moq\/","title":{"rendered":"Use Idle Capacity Reduce MOQ: A Safer Way to Ask for a Pilot Production Slot"},"content":{"rendered":"<h1 id=\"use-idle-capacity-reduce-moq-a-safer-way-to-ask-for-a-pilot-production-slot\">Use Idle Capacity Reduce MOQ: A Safer Way to Ask for a Pilot Production Slot<\/h1>\n<p>A supplier&#8217;s standard MOQ is often based on setup, materials, labor planning, packaging, machine time, and the cost of disrupting a normal run. A quieter period may create an opportunity for a smaller pilot, but it is not proof that the factory has unused capacity or must offer a discount.<\/p>\n<p>To <strong>use idle capacity reduce MOQ<\/strong> risk, approach the supplier with a flexible, fully specified request. Ask whether there is a suitable short-run or off-peak production window, then document the scope, price, <a href=\"https:\/\/sourcingall.com\/es\/services\/\">calidad<\/a> controls, delivery window, and change process if the supplier accepts.<\/p>\n<p>Preguntar <a href=\"https:\/\/sourcingall.com\/es\/about-us\/\">acerca de<\/a> the window. Do not assume it exists. A documented <strong>use idle capacity reduce MOQ<\/strong> request starts with the supplier&#8217;s own scheduling response.<\/p>\n<h2 id=\"table-of-contents\">Table of contents<\/h2>\n<ul>\n<li><a href=\"#what-does-use-idle-capacity-reduce-moq-mean\">What does use idle capacity reduce MOQ mean?<\/a><\/li>\n<li><a href=\"#why-can-an-off-peak-slot-support-a-pilot\">Why can an off-peak slot support a pilot?<\/a><\/li>\n<li><a href=\"#how-can-you-ask-about-capacity-without-guessing\">How can you ask about capacity without guessing?<\/a><\/li>\n<li><a href=\"#which-pilot-structures-can-buyers-compare\">Which pilot structures can buyers compare?<\/a><\/li>\n<li><a href=\"#what-should-a-slot-confirmation-include\">What should a slot confirmation include?<\/a><\/li>\n<li><a href=\"#how-should-price-and-any-short-run-premium-be-handled\">How should price and any short-run premium be handled?<\/a><\/li>\n<li><a href=\"#what-quality-controls-should-remain-unchanged\">What quality controls should remain unchanged?<\/a><\/li>\n<li><a href=\"#what-are-the-limits-of-using-idle-capacity-to-reduce-moq\">What are the limits of using idle capacity to reduce MOQ?<\/a><\/li>\n<li><a href=\"#frequently-asked-questions\">Frequently asked questions<\/a><\/li>\n<\/ul>\n<h2 id=\"what-does-use-idle-capacity-reduce-moq-mean\">What does use idle capacity reduce MOQ mean?<\/h2>\n<p>To <strong>use idle capacity reduce MOQ<\/strong> is to explore whether a supplier can schedule a smaller, clearly defined production run in an available window that would not fit its normal batch pattern. It is a scheduling discussion, not a claim about the supplier&#8217;s confidential utilization or financial condition. The phrase <strong>use idle capacity reduce MOQ<\/strong> describes an option to explore, not a finding about the factory.<\/p>\n<table>\n<thead>\n<tr>\n<th>Term<\/th>\n<th>Practical meaning<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Planned quantity<\/td>\n<td>A buyer&#8217;s forecast or proposed need, not necessarily an order<\/td>\n<\/tr>\n<tr>\n<td>Supplier commitment<\/td>\n<td>Quantity or slot the supplier explicitly agrees to support<\/td>\n<\/tr>\n<tr>\n<td>Released PO<\/td>\n<td>The actual authorized order that triggers work under agreed terms<\/td>\n<\/tr>\n<tr>\n<td>Pilot slot<\/td>\n<td>A limited production window for a defined test or first run<\/td>\n<\/tr>\n<tr>\n<td>Off-peak window<\/td>\n<td>A period the supplier says it can consider for the requested work<\/td>\n<\/tr>\n<tr>\n<td>MOQ waiver<\/td>\n<td>A specifically accepted exception, not an assumed entitlement<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Oracle describes supplier release schedules as a way to communicate demand profiles and capture supplier commitments against planned quantities.[^1] The same discipline matters in a small <a href=\"https:\/\/sourcingall.com\/es\/\">abastecimiento<\/a> conversation: separate the forecast from the committed slot and the released PO.<\/p>\n<h2 id=\"why-can-an-off-peak-slot-support-a-pilot\">Why can an off-peak slot support a pilot?<\/h2>\n<p>A supplier may have a gap between runs, an available machine, a convenient material batch, or a period when a smaller order is operationally acceptable. It may also have no such opportunity. The buyer should make the request easy to evaluate without pressuring the supplier to sacrifice quality or safety. That is the responsible way to <strong>use idle capacity reduce MOQ<\/strong> exposure.<\/p>\n<table>\n<thead>\n<tr>\n<th>Buyer flexibility<\/th>\n<th>Why it may help the supplier assess a pilot<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Flexible production dates<\/td>\n<td>Gives the supplier room to fit the work around confirmed orders<\/td>\n<\/tr>\n<tr>\n<td>Clear product scope<\/td>\n<td>Reduces engineering and setup uncertainty<\/td>\n<\/tr>\n<tr>\n<td>Consolidated SKU mix<\/td>\n<td>May reduce changeover or material handling complexity<\/td>\n<\/tr>\n<tr>\n<td>Ready artwork and packaging<\/td>\n<td>Avoids a slot being lost while inputs are incomplete<\/td>\n<\/tr>\n<tr>\n<td>Defined inspection plan<\/td>\n<td>Makes quality and release expectations visible<\/td>\n<\/tr>\n<tr>\n<td>Documented payment timing<\/td>\n<td>Lets the supplier assess commercial readiness<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>The phrase <strong>use idle capacity reduce MOQ<\/strong> should never mean asking a factory to rush work, bypass inspection, ignore labor rules, or run equipment unsafely. A lower quantity is not worth a quality or safety failure.<\/p>\n<h2 id=\"how-can-you-ask-about-capacity-without-guessing\">How can you ask about capacity without guessing?<\/h2>\n<p>Avoid telling a supplier that its factory \u201clooks idle\u201d or demanding a capacity discount. Ask a factual scheduling question with enough detail for the supplier to respond without revealing confidential production data.<\/p>\n<blockquote>\n<p><strong>Request template:<\/strong> \u201cWe are planning a limited pilot for the attached product revision. If you have an available production window in the next planning period that can support this quantity without affecting quality or confirmed customer orders, please advise the feasible production and shipment dates. Please <a href=\"https:\/\/sourcingall.com\/es\/get-a-quote\/\">cita<\/a> the unit price, any separately stated short-run or setup charge, MOQ exception if accepted, material and packaging readiness requirements, inspection process, and the deadline for us to release the PO.\u201d<\/p>\n<\/blockquote>\n<table>\n<thead>\n<tr>\n<th>Supplier response<\/th>\n<th>Appropriate next step<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>A window is available<\/td>\n<td>Request written scope, dates, price, and confirmation conditions<\/td>\n<\/tr>\n<tr>\n<td>A smaller run is possible with a premium<\/td>\n<td>Compare the documented premium with inventory and timing exposure<\/td>\n<\/tr>\n<tr>\n<td>A window is possible only with flexible delivery<\/td>\n<td>Confirm the delivery range and buyer acceptance in writing<\/td>\n<\/tr>\n<tr>\n<td>No suitable window exists<\/td>\n<td>Respect the <a href=\"https:\/\/sourcingall.com\/es\/faqs\/\">respuesta<\/a> and consider a standard MOQ, another timing plan, or another capable source<\/td>\n<\/tr>\n<tr>\n<td>Supplier asks for a forecast<\/td>\n<td>Label it clearly as planned or binding, then state the release rule<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>A <strong>use idle capacity reduce MOQ<\/strong> request works best when it gives the factory permission to say no. That helps preserve truthful scheduling <a href=\"https:\/\/sourcingall.com\/es\/articles\/\">informaci\u00f3n<\/a> in a <strong>use idle capacity reduce MOQ<\/strong> discussion.<\/p>\n<h2 id=\"which-pilot-structures-can-buyers-compare\">Which pilot structures can buyers compare?<\/h2>\n<p>There are several ways to reduce first-order exposure without pretending that every supplier must accept a low MOQ. Each option can support a <strong>use idle capacity reduce MOQ<\/strong> plan if the supplier confirms it.<\/p>\n<table>\n<thead>\n<tr>\n<th>Structure<\/th>\n<th>What it can offer<\/th>\n<th><a href=\"https:\/\/sourcingall.com\/es\/how-we-work\/\">Control<\/a> needed<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>One pilot slot<\/td>\n<td>A defined small run to test product and process<\/td>\n<td>Exact quantity, product revision, sample acceptance, and decision after pilot<\/td>\n<\/tr>\n<tr>\n<td>Consolidated variant run<\/td>\n<td>Combines compatible variants within one production setup<\/td>\n<td>SKU mix, component compatibility, labeling, and count reconciliation<\/td>\n<\/tr>\n<tr>\n<td>Flexible production window<\/td>\n<td>Lets supplier select from a stated range<\/td>\n<td>Latest acceptable ready and shipment dates<\/td>\n<\/tr>\n<tr>\n<td>Factory-held finished goods<\/td>\n<td>Delays destination receipt after a larger production run<\/td>\n<td>Storage, inventory count, condition, release, ownership, and payment terms<\/td>\n<\/tr>\n<tr>\n<td>Standard MOQ with staged shipments<\/td>\n<td>Maintains production scale while spreading delivery<\/td>\n<td>Total commitment, shipment dates, inspection, and release schedule<\/td>\n<\/tr>\n<tr>\n<td>Small run with stated premium<\/td>\n<td>Prices an exception instead of disguising it<\/td>\n<td>Premium amount, what it covers, and whether it is refundable or creditable if agreed<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Oracle&#8217;s release-scheduling documentation distinguishes planned, committed, and released quantities and keeps schedule history.[^1] A <strong>use idle capacity reduce MOQ<\/strong> pilot should preserve the same distinction, even in a simple spreadsheet and <a href=\"https:\/\/sourcingall.com\/es\/contact-us\/\">correo electr\u00f3nico<\/a> trail.<\/p>\n<h2 id=\"what-should-a-slot-confirmation-include\">What should a slot confirmation include?<\/h2>\n<p>A verbal \u201cwe can fit you in\u201d is not enough. The supplier may mean capacity is tentatively available while the buyer may hear a confirmed production appointment. Record the status and conditions before depositing funds or sending materials. This is essential when you <strong>use idle capacity reduce MOQ<\/strong> through a short-run slot.<\/p>\n<table>\n<thead>\n<tr>\n<th>Confirmation item<\/th>\n<th>What to document<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Product<\/td>\n<td>SKU, drawing, approved sample, packaging, and label revision<\/td>\n<\/tr>\n<tr>\n<td>Cantidad<\/td>\n<td>Pilot quantity, permitted tolerance, and any SKU mix<\/td>\n<\/tr>\n<tr>\n<td>Capacity status<\/td>\n<td>Tentative inquiry, reserved slot, confirmed production, or completed production<\/td>\n<\/tr>\n<tr>\n<td>Production window<\/td>\n<td>Earliest and latest date, plus any release deadline<\/td>\n<\/tr>\n<tr>\n<td>Inputs<\/td>\n<td>Material, tooling, artwork, packaging, and approval prerequisites<\/td>\n<\/tr>\n<tr>\n<td>Precio<\/td>\n<td>Unit price, currency, any setup or short-run premium, and included costs<\/td>\n<\/tr>\n<tr>\n<td>Calidad<\/td>\n<td>Sample approval, inspection criteria, test requirements, and nonconformance process<\/td>\n<\/tr>\n<tr>\n<td>Entrega<\/td>\n<td>Ready date, delivery term, destination, and freight treatment<\/td>\n<\/tr>\n<tr>\n<td>Payment<\/td>\n<td>Deposit or milestone, invoice requirements, and stated conditions<\/td>\n<\/tr>\n<tr>\n<td>Change rule<\/td>\n<td>Written treatment of rescheduling, cancellation, scope changes, and material changes<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>A <strong>use idle capacity reduce MOQ<\/strong> agreement should say whether the supplier can reassign the slot if the buyer misses the release or input deadline. This avoids a disagreement about what \u201creserved\u201d meant.<\/p>\n<h2 id=\"how-should-price-and-any-short-run-premium-be-handled\">How should price and any short-run premium be handled?<\/h2>\n<p>A lower MOQ may increase the supplier&#8217;s unit cost. The buyer does not need to reject that fact, but should ask for commercial clarity. A short-run premium should be named rather than hidden inside a changed unit price without explanation.<\/p>\n<table>\n<thead>\n<tr>\n<th>Price question<\/th>\n<th>Record to request<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Unit price<\/td>\n<td>Currency, quantity basis, and product revision<\/td>\n<\/tr>\n<tr>\n<td>Setup or short-run charge<\/td>\n<td>Separate amount, stated reason, and payment trigger<\/td>\n<\/tr>\n<tr>\n<td>Embalaje<\/td>\n<td>Included, separately priced, or supplied by buyer<\/td>\n<\/tr>\n<tr>\n<td>Tooling<\/td>\n<td>New, existing, refundable, creditable, or other agreed treatment<\/td>\n<\/tr>\n<tr>\n<td>Freight<\/td>\n<td>Delivery term, destination, and whether freight is included<\/td>\n<\/tr>\n<tr>\n<td>Future order treatment<\/td>\n<td>Whether the pilot premium is credited against a later order, only if expressly agreed<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Do not make a universal claim that a small premium is better than a larger MOQ. Compare the total cost, cash timing, inventory risk, storage, packaging exposure, and decision value of the pilot. That is the practical calculation behind <strong>use idle capacity reduce MOQ<\/strong> planning, rather than a blanket demand for a price concession.<\/p>\n<h2 id=\"what-quality-controls-should-remain-unchanged\">What quality controls should remain unchanged?<\/h2>\n<p>A scheduling opportunity must not become a quality exception. The same product and packaging controls that apply to a normal production order should be considered for a pilot, with any changes explicitly approved.<\/p>\n<table>\n<thead>\n<tr>\n<th>Control<\/th>\n<th>Pilot evidence<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Product revision<\/td>\n<td>Approved drawing, sample, and bill of materials reference<\/td>\n<\/tr>\n<tr>\n<td>Incoming material<\/td>\n<td>Supplier confirmation and any agreed verification<\/td>\n<\/tr>\n<tr>\n<td>Controles en proceso<\/td>\n<td>Defined checkpoints or production records where appropriate<\/td>\n<\/tr>\n<tr>\n<td>Final inspection<\/td>\n<td>Quantity, appearance, function, packaging, labels, and agreed tests<\/td>\n<\/tr>\n<tr>\n<td>Shipment release<\/td>\n<td>Inspection result, packing list, and buyer release process<\/td>\n<\/tr>\n<tr>\n<td>Nonconformance<\/td>\n<td>Written disposition for rework, replacement, reject, or deviation approval<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>George Washington University&#8217;s public PO terms are one example of requiring goods to conform to specifications and allowing inspection; they also require written acceptance for modifications.[^2] Those are not default terms for a new private order, but they demonstrate why a pilot slot should not rely on informal scope changes.<\/p>\n<h2 id=\"what-are-the-limits-of-using-idle-capacity-to-reduce-moq\">What are the limits of using idle capacity to reduce MOQ?<\/h2>\n<p>To <strong>use idle capacity reduce MOQ<\/strong> cannot prove a factory has available time, guarantee a lower price, reserve a production slot without acceptance, or eliminate normal product and packaging minimums. It cannot replace capacity verification, supplier due diligence, qualified contract review, or quality planning.<\/p>\n<p>The useful outcome is narrower and more reliable: a buyer asks a respectful question, the supplier provides a documented answer, and any pilot is released under explicit price, timing, and quality controls.<\/p>\n<p>Keep planned, committed, and released quantities separate. This protects the buyer and supplier when they <strong>use idle capacity reduce MOQ<\/strong> arrangements.<\/p>\n<h2 id=\"frequently-asked-questions\">Frequently asked questions<\/h2>\n<h3 id=\"what-does-use-idle-capacity-reduce-moq-mean_1\">What does use idle capacity reduce MOQ mean?<\/h3>\n<p>It means asking whether a supplier can support a documented smaller run in an available production window. It does not mean assuming the supplier has unused capacity or owes a discount.<\/p>\n<h3 id=\"how-do-i-ask-a-factory-about-an-off-peak-production-slot\">How do I ask a factory about an off-peak production slot?<\/h3>\n<p>Provide the product revision, quantity, flexibility on dates, quality requirements, packaging readiness, and requested delivery window. Ask the supplier to confirm whether it can support the work.<\/p>\n<h3 id=\"can-a-factory-lower-moq-during-a-slow-period\">Can a factory lower MOQ during a slow period?<\/h3>\n<p>It may be willing to consider a smaller run, but the decision depends on its own setup, materials, workload, quality controls, and commercial terms. Obtain a written quote and confirmation.<\/p>\n<h3 id=\"should-i-offer-a-premium-for-a-short-run\">Should I offer a premium for a short run?<\/h3>\n<p>A documented premium may be one option. Compare it with inventory, storage, timing, and risk rather than assuming either option is always better.<\/p>\n<h3 id=\"does-an-off-peak-slot-reserve-capacity-automatically\">Does an off-peak slot reserve capacity automatically?<\/h3>\n<p>No. State whether the slot is an inquiry, tentative hold, reservation, or confirmed production, and list the conditions that must be met.<\/p>\n<h3 id=\"what-is-the-difference-between-a-forecast-and-a-commitment\">What is the difference between a forecast and a commitment?<\/h3>\n<p>A forecast is a plan. A supplier commitment is the quantity or schedule the supplier agrees to support. A released PO is the actual authorized order.<\/p>\n<h3 id=\"can-i-use-a-pilot-slot-for-several-skus\">Can I use a pilot slot for several SKUs?<\/h3>\n<p>Possibly, if the supplier agrees the variants are compatible with one run. Record the SKU mix, materials, labels, packaging, and counts.<\/p>\n<h3 id=\"what-happens-if-i-miss-a-reserved-slot-deadline\">What happens if I miss a reserved slot deadline?<\/h3>\n<p>The answer should be written in the confirmation. The supplier may be able to reassign the slot or require a new schedule and price.<\/p>\n<h3 id=\"should-quality-checks-be-reduced-for-a-pilot\">Should quality checks be reduced for a pilot?<\/h3>\n<p>No. Keep the relevant product, packaging, inspection, and release controls. Any approved deviation should be specific and documented.<\/p>\n<h3 id=\"can-idle-capacity-terms-go-in-a-po\">Can idle capacity terms go in a PO?<\/h3>\n<p>Yes, reference the confirmed slot, product scope, quantity, price, production window, delivery term, inspection, and written change process in the PO or attachment.<\/p>\n<h2 id=\"what-should-an-off-peak-pilot-request-make-clear\">What should an off-peak pilot request make clear?<\/h2>\n<p>A controlled <strong>use idle capacity reduce MOQ<\/strong> request makes the product, pilot quantity, capacity status, production window, price, quality controls, and release conditions clear. That lets a buyer explore scheduling flexibility without turning uncertainty into an undocumented promise.<\/p>\n<h2 id=\"references\">Referencias<\/h2>\n<p>[^1]: <a href=\"https:\/\/docs.oracle.com\/en\/applications\/jd-edwards\/supply-chain-manufacturing\/9.2\/eoarp\/understanding-supplier-release-scheduling.html\" target=\"_blank\" rel=\"noopener\">Oracle, &#8220;Understanding Supplier Release Scheduling&#8221;<\/a><\/p>\n<p>[^2]: <a href=\"https:\/\/procurement.gwu.edu\/standard-purchase-order-terms-and-conditions\" target=\"_blank\" rel=\"noopener\">George Washington University Procurement, &#8220;Standard Purchase Order Terms and Conditions&#8221;<\/a><\/p>\n<h2 id=\"related-reading\">Related reading<\/h2>\n<ul>\n<li><a href=\"https:\/\/sourcingall.com\/es\/staggered-shipments-to-meet-moq\/\">Staggered shipments to meet MOQ<\/a><\/li>\n<li><a href=\"https:\/\/sourcingall.com\/es\/seasonal-product-moq-china\/\">Seasonal product MOQ China<\/a><\/li>\n<li><a href=\"https:\/\/sourcingall.com\/es\/reorder-price-freeze-supplier\/\">Reorder price freeze supplier<\/a><\/li>\n<\/ul>","protected":false},"excerpt":{"rendered":"<p>Learn how to use idle capacity reduce MOQ risk through documented off-peak pilot slots, clear pricing, quality controls, and release terms.<\/p>","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"rank_math_internal_links_processed":["1"],"_uag_page_assets":["a:9:{s:3:\"css\";s:263:\".uag-blocks-common-selector{z-index:var(--z-index-desktop) !important}@media (max-width: 976px){.uag-blocks-common-selector{z-index:var(--z-index-tablet) !important}}@media (max-width: 767px){.uag-blocks-common-selector{z-index:var(--z-index-mobile) !important}}\n\";s:2:\"js\";s:0:\"\";s:18:\"current_block_list\";a:15:{i:0;s:11:\"core\/search\";i:1;s:10:\"core\/group\";i:2;s:12:\"core\/heading\";i:3;s:17:\"core\/latest-posts\";i:4;s:20:\"core\/latest-comments\";i:5;s:13:\"core\/archives\";i:6;s:15:\"core\/categories\";i:8;s:25:\"greenshift-blocks\/heading\";i:9;s:22:\"greenshift-blocks\/text\";i:10;s:14:\"core\/paragraph\";i:12;s:18:\"core\/legacy-widget\";i:13;s:17:\"core\/social-links\";i:15;s:16:\"core\/social-link\";i:16;s:21:\"trp\/language-switcher\";i:17;s:9:\"core\/html\";}s:8:\"uag_flag\";b:0;s:11:\"uag_version\";s:10:\"1789894816\";s:6:\"gfonts\";a:0:{}s:10:\"gfonts_url\";s:0:\"\";s:12:\"gfonts_files\";a:0:{}s:14:\"uag_faq_layout\";b:0;}"]},"categories":[33],"tags":[],"class_list":["post-3150","post","type-post","status-publish","format-standard","hentry","category-supplier-verification"],"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"trp-custom-language-flag":false},"uagb_author_info":{"display_name":"admin","author_link":"https:\/\/sourcingall.com\/es\/author\/admin\/"},"uagb_comment_info":0,"uagb_excerpt":"Learn how to use idle capacity reduce MOQ risk through documented off-peak pilot slots, clear pricing, quality controls, and release terms.","_links":{"self":[{"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/posts\/3150","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/comments?post=3150"}],"version-history":[{"count":1,"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/posts\/3150\/revisions"}],"predecessor-version":[{"id":3361,"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/posts\/3150\/revisions\/3361"}],"wp:attachment":[{"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/media?parent=3150"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/categories?post=3150"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/tags?post=3150"}],"curies":[{"name":"gracias","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}