{"id":3086,"date":"2026-08-29T09:00:00","date_gmt":"2026-08-29T01:00:00","guid":{"rendered":"https:\/\/sourcingall.com\/?p=3086"},"modified":"2026-08-29T09:00:00","modified_gmt":"2026-08-29T01:00:00","slug":"how-to-verify-whether-a-chinese-supplier-subcontracts-production-and-why-it-matters","status":"publish","type":"post","link":"https:\/\/sourcingall.com\/es\/supplier-verification\/how-to-verify-whether-a-chinese-supplier-subcontracts-production-and-why-it-matters\/","title":{"rendered":"How to Verify Whether a Chinese Supplier Subcontracts Production (and Why It Matters)"},"content":{"rendered":"<p>Two short opening paragraphs<\/p>\n<p>You can verify subcontracting practices with a short evidence pack and a few targeted checks before you accept a supplier. Many buyers confirm whether a supplier uses subcontractors by requesting a production flow diagram, a sub-supplier declaration, and recent examples that show chain of custody and <a href=\"https:\/\/sourcingall.com\/es\/how-we-work\/\">calidad<\/a> handoffs.<\/p>\n<p>Subcontracting is acceptable in many <a href=\"https:\/\/sourcingall.com\/es\/case-studies\/\">casos<\/a>. Undisclosed or uncontrolled subcontracting raises risks for traceability, quality, and delivery. Use the checks and controls below to verify practices, require fitting contract and inspection clauses, and decide whether to accept subcontracting for a given product category.<\/p>\n<h2 id=\"table-of-contents\">Table of contents<\/h2>\n<ul>\n<li><a href=\"#how-can-i-verify-subcontracting-practices-before-placing-an-order\">How can I verify subcontracting practices before placing an order?<\/a><\/li>\n<li><a href=\"#what-evidence-should-i-ask-for-to-verify-subcontracting-practices\">What evidence should I ask for to verify subcontracting practices?<\/a><\/li>\n<li><a href=\"#what-contractual-controls-should-i-require-to-verify-subcontracting-practices\">What contractual controls should I require to verify subcontracting practices?<\/a><\/li>\n<li><a href=\"#how-should-i-inspect-and-audit-to-verify-subcontracting-practices\">How should I inspect and audit to verify subcontracting practices?<\/a><\/li>\n<li><a href=\"#when-is-subcontracting-acceptable-and-when-should-i-refuse-it\">When is subcontracting acceptable and when should I refuse it?<\/a><\/li>\n<li><a href=\"#how-do-i-pilot-and-approve-a-subcontracted-run\">How do I pilot and approve a subcontracted run?<\/a><\/li>\n<\/ul>\n<h2 id=\"how-can-i-verify-subcontracting-practices-before-placing-an-order\">How can I verify subcontracting practices before placing an order?<\/h2>\n<p><a href=\"https:\/\/sourcingall.com\/es\/faqs\/\">Answer<\/a>: Ask for a simple production flow diagram, a signed sub-supplier declaration, and recent examples of subcontracted jobs and handoffs.<\/p>\n<p>Begin verification by asking the supplier to provide a production flow diagram that maps each operation and shows which legal entity performs it. Ask for a signed sub-supplier declaration that names any regular external vendors and confirms who is responsible for quality and traceability. <a href=\"https:\/\/sourcingall.com\/es\/get-a-quote\/\">Request<\/a> recent subcontracting examples that document how parts move between locations and what inspection steps occur at each handoff. Use the checklist to verify subcontracting practices for each supplier reply.<\/p>\n<p>What to look for in replies<br \/>\n&#8211; The production flow diagram should show steps, where parts move, and who owns the inventory at each step. Microsoft <a href=\"https:\/\/sourcingall.com\/es\/services\/\">guidance<\/a> notes that subcontracted operations commonly require materials or semi finished goods to move to a vendor location before further work and then continue to the next operation or warehouse [2].<br \/>\n&#8211; The sub-supplier declaration should state whether subcontracting is routine or exceptional and who is contractually responsible for quality and final inspection [1].<br \/>\n&#8211; Recent subcontracting examples should include document evidence such as material transfer records, inspection reports at handoffs, and invoices that show legal entity names.<\/p>\n<p>Practical verification checklist<br \/>\n&#8211; Request production flow diagram<br \/>\n&#8211; Request sub-supplier declaration<br \/>\n&#8211; Request two recent subcontracting examples with transfer records<br \/>\n&#8211; Confirm legal entity invoicing and contract party<br \/>\n&#8211; Confirm the quality checks performed at each transfer<br \/>\n&#8211; Use this list to verify subcontracting practices quickly<\/p>\n<h2 id=\"what-evidence-should-i-ask-for-to-verify-subcontracting-practices\">What evidence should I ask for to verify subcontracting practices?<\/h2>\n<p>Answer: Ask for a production flow evidence pack that combines a process map, sub-supplier list, transfer documents, and inspection records.<\/p>\n<p>A useful evidence pack is short and focused. Ask the supplier to supply:<br \/>\n&#8211; Production flow diagram showing operations by location and legal entity<br \/>\n&#8211; List of approved sub-suppliers with addresses and scope of work<br \/>\n&#8211; Material transfer records or delivery notes that show batch or serial handoffs<br \/>\n&#8211; Incoming and outgoing inspection reports tied to specific handoffs<br \/>\n&#8211; Nonconformance and corrective action records where subcontracting was involved<\/p>\n<p>This helps you verify subcontracting practices before approval.<\/p>\n<p>Introductory table with evidence categories and why they matter<br \/>\nBelow is a comparison of common evidence items and their value for making a decision. Use this to prioritize requests when time is limited. Prioritize items that will verify subcontracting practices with minimal burden.<\/p>\n<table>\n<thead>\n<tr>\n<th>Evidence item<\/th>\n<th style=\"text-align: right;\">What it shows<\/th>\n<th>How useful it is<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Production flow diagram<\/td>\n<td style=\"text-align: right;\">Where work happens and who performs it<\/td>\n<td>Alto<\/td>\n<\/tr>\n<tr>\n<td>Sub-supplier list and scope<\/td>\n<td style=\"text-align: right;\">Which vendors and what operations they do<\/td>\n<td>Alto<\/td>\n<\/tr>\n<tr>\n<td>Transfer documents<\/td>\n<td style=\"text-align: right;\">Chain of custody for materials or batches<\/td>\n<td>Alto<\/td>\n<\/tr>\n<tr>\n<td>Inspection reports at handoffs<\/td>\n<td style=\"text-align: right;\">Quality controls between parties<\/td>\n<td>Alto<\/td>\n<\/tr>\n<tr>\n<td>Invoices and legal entity names<\/td>\n<td style=\"text-align: right;\">Who bills and who is contractually responsible<\/td>\n<td>Medio<\/td>\n<\/tr>\n<tr>\n<td>Photographs of shopfloor<\/td>\n<td style=\"text-align: right;\">Visual confirmation of activities<\/td>\n<td>Medio<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Comparison of strong versus weak evidence<br \/>\nThis table compares strong evidence that supports acceptance versus weak or missing items that should trigger escalation.<\/p>\n<table>\n<thead>\n<tr>\n<th>Strong evidence<\/th>\n<th>Weak or missing evidence<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Diagram plus transfer records and inspection logs<\/td>\n<td>No diagram and vague verbal statements<\/td>\n<\/tr>\n<tr>\n<td>Signed sub-supplier declaration with names<\/td>\n<td>No named sub-suppliers or undisclosed vendors<\/td>\n<\/tr>\n<tr>\n<td>Invoicing aligned to contract party<\/td>\n<td>Invoices from unknown entities<\/td>\n<\/tr>\n<tr>\n<td>Corrective records after issues<\/td>\n<td>No record of handling nonconformances<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Strong evidence is what lets you verify subcontracting practices reliably.<\/p>\n<p>Citing guidance<br \/>\nRequire documentation that shows handoffs and inspection. The Microsoft guidance states subcontract work may involve sending materials offsite and then moving semi finished goods back into the production flow [2]. Industrial Monitor Direct explains a control framework can define whether subcontracting is prohibited, disclosed, or subject to prior approval and should include change notification and recordkeeping requirements [1]. Use guidance documents to verify subcontracting practices and set record standards.<\/p>\n<h2 id=\"what-contractual-controls-should-i-require-to-verify-subcontracting-practices\">What contractual controls should I require to verify subcontracting practices?<\/h2>\n<p>Answer: Require clauses that enforce disclosure, approval for new sub-suppliers, quality responsibility, and verification rights.<\/p>\n<p>Ask legal or <a href=\"https:\/\/sourcingall.com\/es\/\">abastecimiento<\/a> counsel to draft and review contract language that sets out:<br \/>\n&#8211; Disclosure and prior approval for subcontracting of critical operations<br \/>\n&#8211; Requirement to flow down specifications and recordkeeping to sub-suppliers<br \/>\n&#8211; Supplier responsibility for quality, even if work is subcontracted<br \/>\n&#8211; Notification timing and change control for any planned subcontracting<br \/>\n&#8211; Right to access sub-supplier records and to audit or inspect sub-suppliers<\/p>\n<p>Contract language should enable you to verify subcontracting practices during the contract term.<\/p>\n<p>Example clause topics to raise with counsel<br \/>\nConsider raising these topics with a qualified lawyer or sourcing professional. This is not legal <a href=\"https:\/\/sourcingall.com\/es\/articles\/\">advice<\/a>. Ask <a href=\"https:\/\/sourcingall.com\/es\/about-us\/\">acerca de<\/a>:<br \/>\n&#8211; Approval process for new sub-suppliers<br \/>\n&#8211; Required evidence and timing for notification of subcontracting<br \/>\n&#8211; Responsibility for rework and warranty when subcontractors are used<br \/>\n&#8211; Confidentiality obligations for designs and tooling when shared with sub-suppliers<br \/>\n&#8211; Verification rights including access for inspectors or third party auditors<\/p>\n<p>Clauses should make it possible to verify subcontracting practices for critical operations.<\/p>\n<p>Contract clause comparison<br \/>\nUse the table below to compare simple contract approaches. This can help you decide whether to demand strict control, conditional approval, or only disclosure.<\/p>\n<table>\n<thead>\n<tr>\n<th>Contract approach<\/th>\n<th style=\"text-align: right;\">Typical buyer requirement<\/th>\n<th>When to use<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Prohibit subcontracting<\/td>\n<td style=\"text-align: right;\">No subcontracting without written waiver<\/td>\n<td>High risk products and IP sensitive items<\/td>\n<\/tr>\n<tr>\n<td>Prior approval<\/td>\n<td style=\"text-align: right;\">Supplier must request approval before using a new sub-supplier<\/td>\n<td>Moderate to high risk products<\/td>\n<\/tr>\n<tr>\n<td>Disclosure only<\/td>\n<td style=\"text-align: right;\">Supplier must disclose regular sub-suppliers<\/td>\n<td>Low risk, commodity items<\/td>\n<\/tr>\n<tr>\n<td>Flow down only<\/td>\n<td style=\"text-align: right;\">Supplier must flow down specs to sub-suppliers<\/td>\n<td>When buyer holds supplier fully responsible<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Note that a control framework can restrict subcontracting or require disclosure and flow down, depending on risk [1].<\/p>\n<h2 id=\"how-should-i-inspect-and-audit-to-verify-subcontracting-practices\">How should I inspect and audit to verify subcontracting practices?<\/h2>\n<p>Answer: Combine on site inspection of the main supplier with rights to inspect sub-suppliers, and use handoff checks and sample testing.<\/p>\n<p>Inspection steps you can require and execute<br \/>\n&#8211; On site inspection of the supplier that includes review of the production flow diagram and review of transfer documents<br \/>\n&#8211; Remote or in person audit rights for sub-suppliers where critical operations occur<br \/>\n&#8211; Handoff inspections when material moves between parties with documented acceptance criteria<br \/>\n&#8211; Incoming inspection against buyer specifications when material returns to the main supplier or enters your supply chain<br \/>\n&#8211; Sample testing and traceability checks tied to transfer records<\/p>\n<p>Inspection plans should specify how to verify subcontracting practices at each handoff.<\/p>\n<p>Introductory inspection comparison table<br \/>\nThe table below compares inspection focus areas and their typical effectiveness in detecting hidden subcontracting or poor controls.<\/p>\n<table>\n<thead>\n<tr>\n<th>Inspection focus<\/th>\n<th style=\"text-align: right;\">Detects undisclosed subcontracting?<\/th>\n<th>Detects quality issues from subcontracting?<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Shopfloor walk and process review<\/td>\n<td style=\"text-align: right;\">Medio<\/td>\n<td>Medio<\/td>\n<\/tr>\n<tr>\n<td>Review of transfer documents and invoices<\/td>\n<td style=\"text-align: right;\">Alto<\/td>\n<td>Alto<\/td>\n<\/tr>\n<tr>\n<td>Audit or visit to sub-supplier<\/td>\n<td style=\"text-align: right;\">Alto<\/td>\n<td>Alto<\/td>\n<\/tr>\n<tr>\n<td>Remote photo or video checks<\/td>\n<td style=\"text-align: right;\">Low to Medium<\/td>\n<td>Low to Medium<\/td>\n<\/tr>\n<tr>\n<td>Sample testing of incoming material<\/td>\n<td style=\"text-align: right;\">Bajo<\/td>\n<td>Alto<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Material and traceability checks<br \/>\nWhen material moves offsite for subcontract work, ensure the movement is recorded and that acceptance criteria are applied at handoffs. Microsoft documentation describes how subcontract work often requires moving materials or semi finished goods between locations and then continuing production [2]. Traceability records are essential to verify subcontracting practices when parts move offsite. The key is to tie inspection and traceability records to those movements.<\/p>\n<h2 id=\"when-is-subcontracting-acceptable-and-when-should-i-refuse-it\">When is subcontracting acceptable and when should I refuse it?<\/h2>\n<p>Answer: Accept subcontracting when it is disclosed, controlled, and verifiable; refuse it when it is undisclosed, shifts legal responsibility, or breaks traceability.<\/p>\n<p>Decision rule examples<br \/>\n&#8211; Example decision rule 1: Accept subcontracting for a non critical surface finish step if the supplier provides a named sub-supplier, transfer records, and inspection plans.<br \/>\n&#8211; Example decision rule 2: Refuse subcontracting for final assembly of safety critical products unless the sub-supplier is preapproved and audit results are acceptable.<\/p>\n<p>A decision rule should describe how you will verify subcontracting practices in practice.<\/p>\n<p>Risk based evaluation table<br \/>\nUse this simple scoring table as an example to decide if you accept subcontracting. Score 1 for low risk and 5 for high risk. Add up scores and set your threshold.<\/p>\n<table>\n<thead>\n<tr>\n<th>Factor<\/th>\n<th style=\"text-align: right;\">1 low risk<\/th>\n<th style=\"text-align: right;\">3 medium risk<\/th>\n<th>5 high risk<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Product safety criticality<\/td>\n<td style=\"text-align: right;\">Commodity part<\/td>\n<td style=\"text-align: right;\">Standard component<\/td>\n<td>Safety critical assembly<\/td>\n<\/tr>\n<tr>\n<td>IP sensitivity<\/td>\n<td style=\"text-align: right;\">Public design<\/td>\n<td style=\"text-align: right;\">Limited IP sharing<\/td>\n<td>Proprietary tooling or design<\/td>\n<\/tr>\n<tr>\n<td>Traceability need<\/td>\n<td style=\"text-align: right;\">Not required<\/td>\n<td style=\"text-align: right;\">Batch level<\/td>\n<td>Serial level traceability<\/td>\n<\/tr>\n<tr>\n<td>Supplier disclosure<\/td>\n<td style=\"text-align: right;\">Full named list<\/td>\n<td style=\"text-align: right;\">Partial<\/td>\n<td>No disclosure<\/td>\n<\/tr>\n<tr>\n<td>Audit access<\/td>\n<td style=\"text-align: right;\">Full access<\/td>\n<td style=\"text-align: right;\">Conditional<\/td>\n<td>No access<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Example threshold<br \/>\n&#8211; Total score 5 to 10 Accept with routine checks<br \/>\n&#8211; Total score 11 to 15 Accept with preapproval and audits<br \/>\n&#8211; Total score over 15 Do not accept without major controls<\/p>\n<p>These scoring choices are examples. Adapt them to your product and risk appetite.<\/p>\n<h2 id=\"how-do-i-pilot-and-approve-a-subcontracted-run\">How do I pilot and approve a subcontracted run?<\/h2>\n<p>Answer: Require a pilot run with full traceability, inspection at handoffs, and a written approval gate before volume release.<\/p>\n<p>Pilot run plan<br \/>\n&#8211; Define a pilot quantity and acceptance criteria for parts produced with subcontracting.<br \/>\n&#8211; Require material transfer documents, batch labels, and inspection reports for the pilot.<br \/>\n&#8211; Require one or more independent tests or sample inspections on parts produced under the pilot.<br \/>\n&#8211; Approve the sub-supplier for volume only after pilot acceptance and audit results.<\/p>\n<p>The pilot process must let you verify subcontracting practices before larger releases.<\/p>\n<p>Pilot approval checklist<br \/>\n&#8211; Pilot quantity and timeline set in writing<br \/>\n&#8211; Transfer and inspection records submitted<br \/>\n&#8211; Pilot samples tested and accepted<br \/>\n&#8211; Audit of sub-supplier completed where required<br \/>\n&#8211; Contract amendment or approval letter issued before volume production<\/p>\n<h2 id=\"frequently-asked-questions\">Frequently asked questions<\/h2>\n<ol>\n<li>\n<p>How quickly can I verify subcontracting practices?<br \/>\nYou can get initial confirmation within days if the supplier provides a production flow diagram, a sub-supplier list, and transfer documents quickly.<\/p>\n<\/li>\n<li>\n<p>What is a sub-supplier declaration?<br \/>\nA sub-supplier declaration is a document where the supplier lists which external vendors they use and states responsibilities for quality and traceability.<\/p>\n<\/li>\n<li>\n<p>Are invoices useful to verify subcontracting practices?<br \/>\nYes. Invoices that show different legal entity names can reveal where work was performed and who is billing for it.<\/p>\n<\/li>\n<li>\n<p>Should I let suppliers subcontract for capacity reasons?<br \/>\nYou can allow subcontracting for capacity when it is disclosed and when controls for quality and traceability are in place. Ensure you can verify subcontracting practices for those capacity arrangements.<\/p>\n<\/li>\n<li>\n<p>Can I require the supplier to remain legally responsible for subcontracted work?<br \/>\nYes. Many buyers require the original supplier to accept full responsibility for subcontracted work and to flow down obligations to sub-suppliers.<\/p>\n<\/li>\n<li>\n<p>Is a photo of a shopfloor enough to verify subcontracting practices?<br \/>\nPhotos can help but are limited. Transfer documents, inspection reports, and audits provide stronger verification.<\/p>\n<\/li>\n<li>\n<p>What records should accompany a material handoff?<br \/>\nTransfer or delivery notes, batch or serial numbers, acceptance criteria, and inspection records should accompany handoffs.<\/p>\n<\/li>\n<li>\n<p>Do I need to audit every sub-supplier?<br \/>\nNot necessarily. Use risk based criteria to decide which sub-suppliers require audits or visits.<\/p>\n<\/li>\n<li>\n<p>How do I stop hidden subcontracting?<br \/>\nRequire disclosure clauses, named sub-supplier lists, and verification rights in your contracts to reduce the chance of hidden subcontracting.<\/p>\n<\/li>\n<li>\n<p>Who should I consult for contract language?<br \/>\nConsult a qualified lawyer or sourcing professional for enforceable contract language and to align controls with local law.<\/p>\n<\/li>\n<\/ol>\n<h2 id=\"references\">Referencias<\/h2>\n<p>[1] Industrial Monitor Direct, &#8220;Supplier Subcontracting Controls: Contract Terms and Quality Requirements,&#8221; May 25, 2026. https:\/\/industrialmonitordirect.com\/blogs\/knowledgebase\/supplier-subcontracting-controls-contract-terms-and-quality-requirements<\/p>\n<p>[2] Microsoft Learn, &#8220;Manage subcontracting work in production,&#8221; updated August 13, 2025. https:\/\/learn.microsoft.com\/en-us\/dynamics365\/supply-chain\/production-control\/manage-subcontract-work-production<\/p>\n<h2 id=\"related-reading\">Related reading<\/h2>\n<ul>\n<li>https:\/\/sourcingall.com\/china-sourcing-services\/  <\/li>\n<li>https:\/\/sourcingall.com\/how-our-china-sourcing-process-works\/  <\/li>\n<li>https:\/\/sourcingall.com\/china-sourcing-faqs\/  <\/li>\n<li>https:\/\/sourcingall.com\/request-a-quote\/<\/li>\n<\/ul>\n<p>Closing paragraph<\/p>\n<p>Controlling subcontracting is a matter of recordkeeping, contracts, and inspection. Ask for the production flow diagram, a sub-supplier declaration, and hands on evidence. Then require contract clauses and inspections that match the product risk. Always verify subcontracting practices as part of your approval gate. When in doubt, run a pilot and get legal or sourcing advice before approving volume.<\/p>","protected":false},"excerpt":{"rendered":"<p>Practical steps to verify subcontracting practices with production diagrams, sub-supplier declarations, contract controls, and pilot approvals.<\/p>","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"rank_math_internal_links_processed":["1"],"_uag_page_assets":["a:9:{s:3:\"css\";s:263:\".uag-blocks-common-selector{z-index:var(--z-index-desktop) !important}@media (max-width: 976px){.uag-blocks-common-selector{z-index:var(--z-index-tablet) !important}}@media (max-width: 767px){.uag-blocks-common-selector{z-index:var(--z-index-mobile) !important}}\n\";s:2:\"js\";s:0:\"\";s:18:\"current_block_list\";a:15:{i:0;s:11:\"core\/search\";i:1;s:10:\"core\/group\";i:2;s:12:\"core\/heading\";i:3;s:17:\"core\/latest-posts\";i:4;s:20:\"core\/latest-comments\";i:5;s:13:\"core\/archives\";i:6;s:15:\"core\/categories\";i:8;s:25:\"greenshift-blocks\/heading\";i:9;s:22:\"greenshift-blocks\/text\";i:10;s:14:\"core\/paragraph\";i:12;s:18:\"core\/legacy-widget\";i:13;s:17:\"core\/social-links\";i:15;s:16:\"core\/social-link\";i:16;s:21:\"trp\/language-switcher\";i:17;s:9:\"core\/html\";}s:8:\"uag_flag\";b:0;s:11:\"uag_version\";s:10:\"1788080412\";s:6:\"gfonts\";a:0:{}s:10:\"gfonts_url\";s:0:\"\";s:12:\"gfonts_files\";a:0:{}s:14:\"uag_faq_layout\";b:0;}"],"_uag_css_file_name":["uag-css-3086.css"]},"categories":[33],"tags":[],"class_list":["post-3086","post","type-post","status-publish","format-standard","hentry","category-supplier-verification"],"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"trp-custom-language-flag":false},"uagb_author_info":{"display_name":"admin","author_link":"https:\/\/sourcingall.com\/es\/author\/admin\/"},"uagb_comment_info":0,"uagb_excerpt":"Practical steps to verify subcontracting practices with production diagrams, sub-supplier declarations, contract controls, and pilot approvals.","_links":{"self":[{"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/posts\/3086","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/comments?post=3086"}],"version-history":[{"count":1,"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/posts\/3086\/revisions"}],"predecessor-version":[{"id":3271,"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/posts\/3086\/revisions\/3271"}],"wp:attachment":[{"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/media?parent=3086"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/categories?post=3086"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/tags?post=3086"}],"curies":[{"name":"gracias","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}