{"id":2438,"date":"2026-08-18T15:17:54","date_gmt":"2026-08-18T07:17:54","guid":{"rendered":"https:\/\/sourcingall.com\/sourcing-basics\/negotiate-without-lowering-quality-standard\/"},"modified":"2026-08-21T15:45:53","modified_gmt":"2026-08-21T07:45:53","slug":"negotiate-without-lowering-quality-standard","status":"publish","type":"post","link":"https:\/\/sourcingall.com\/es\/sourcing-basics\/negotiate-without-lowering-quality-standard\/","title":{"rendered":"How to Negotiate Without Lowering Your Quality Standard"},"content":{"rendered":"<p>\u201cCan you make it cheaper?\u201d is a normal sourcing question. It becomes dangerous when neither side says what must change to make that happen.<\/p>\n<p>A lower price can come from a better production method, a different order structure, fewer avoidable variations, a volume commitment, a revised packaging choice, or a supplier\u2019s commercial decision. It can also come from a different material, a weaker component, less testing, looser tolerance, less inspection, less durable packaging, or an undocumented process change. Those are not the same conversation.<\/p>\n<p>The buyer who wants a lower price without lowering the quality standard needs a clear starting point: <strong>define the quality floor before negotiating the cost.<\/strong> Then explore options openly, document every approved change, and verify the result against the released product configuration.<\/p>\n<p>IBM describes sustainable procurement cost reduction as lowering expense while maintaining product integrity, quality, efficiency, and supplier relationships. It contrasts that approach with reactive cost cutting, which can affect quality or service. <a href=\"https:\/\/www.ibm.com\/think\/insights\/procurement-cost-reduction-strategies\" target=\"_blank\" rel=\"noopener\">1<\/a> The distinction is useful in supplier conversations: a lower number is not automatically a better sourcing outcome.<\/p>\n<h2>Define your quality floor before discussing concessions<\/h2>\n<p>A quality floor is the set of product, process, evidence, and delivery requirements that cannot quietly move in exchange for a lower price. It is not a vague instruction to \u201ckeep quality good.\u201d It is the current release package and the acceptance rules attached to it.<\/p>\n<table>\n<thead>\n<tr>\n<th>Quality-floor area<\/th>\n<th>What to identify before negotiation<\/th>\n<th>Example of a clear statement<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Product function<\/td>\n<td>Required use, performance, compatibility, safety-related needs, and operating condition<\/td>\n<td>\u201cThe closure must open and close under the stated test method and acceptance condition.\u201d<\/td>\n<\/tr>\n<tr>\n<td>Material\/component<\/td>\n<td>Approved grade, construction, critical component, or explicitly allowed alternative<\/td>\n<td>\u201cNo material or supplier substitution without written change approval and required verification.\u201d<\/td>\n<\/tr>\n<tr>\n<td>Dimensions and fit<\/td>\n<td>Critical dimensions, tolerance, mating parts, and measurement method<\/td>\n<td>\u201cThe critical fit dimensions and measurement reference remain unchanged.\u201d<\/td>\n<\/tr>\n<tr>\n<td>Appearance<\/td>\n<td>Approved sample, color\/finish\/artwork\/print reference, defect limits, and viewing conditions<\/td>\n<td>\u201cThe approved artwork revision and visual acceptance reference remain the baseline.\u201d<\/td>\n<\/tr>\n<tr>\n<td>Embalaje<\/td>\n<td>Protection, count, labeling, inserts, carton strength, and pack-out rules that protect the product or compliance need<\/td>\n<td>\u201cThe agreed packaging must still prevent damage and preserve required labeling.\u201d<\/td>\n<\/tr>\n<tr>\n<td>Inspection and test<\/td>\n<td>Required checkpoint, scope, sample plan where defined, functional check, report, and release authority<\/td>\n<td>\u201cThe final inspection scope and release criteria are not removed by a price change.\u201d<\/td>\n<\/tr>\n<tr>\n<td>Documentaci\u00f3n<\/td>\n<td>Current drawing, BOM, artwork, specification, golden sample, quote\/PO, and revision list<\/td>\n<td>\u201cThe proposed cost option must identify every document it changes.\u201d<\/td>\n<\/tr>\n<tr>\n<td>Compliance requirement<\/td>\n<td>Buyer-defined regulatory\/customer requirement, test\/certificate need, or label requirement<\/td>\n<td>\u201cAny compliance effect must be checked by the responsible owner before approval.\u201d<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Use a short \u201cnon-negotiables\u201d page rather than relying on memory. Art of Procurement recommends separating must-have outcomes from nice-to-have outcomes before negotiations begin. <a href=\"https:\/\/artofprocurement.com\/blog\/supplier-negotiations-in-strategic-sourcing\" target=\"_blank\" rel=\"noopener\">2<\/a> For a sourcing project, the quality floor contains the must-haves; it does not mean every preference is untouchable.<\/p>\n<h2>Separate product requirements from cost preferences<\/h2>\n<p>Some requests are true quality requirements. Others are preferences, redundancies, or cost drivers that can be evaluated without changing the product\u2019s required purpose. The buyer\u2019s task is to distinguish them honestly.<\/p>\n<table>\n<thead>\n<tr>\n<th>Item under discussion<\/th>\n<th>Ask this first<\/th>\n<th>Possible decision path<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Required material grade<\/td>\n<td>Does changing it alter strength, safety, performance, durability, appearance, compliance, or customer requirement?<\/td>\n<td>Keep it fixed unless a controlled alternative is separately evaluated and approved<\/td>\n<\/tr>\n<tr>\n<td>Cosmetic finish<\/td>\n<td>Is the finish a customer promise, brand requirement, functional protection, or a preference?<\/td>\n<td>If flexible, define alternate finish reference, cost effect, sample, and acceptance check<\/td>\n<\/tr>\n<tr>\n<td>Packaging design<\/td>\n<td>Does the current packaging protect the product and meet labeling\/retail requirements?<\/td>\n<td>Explore size, pack-out, print, or material options while preserving protection and required information<\/td>\n<\/tr>\n<tr>\n<td>Tolerance<\/td>\n<td>Is the tolerance tied to fit\/function or simply inherited from an older drawing?<\/td>\n<td>Confirm engineering need and measurement method before proposing any change<\/td>\n<\/tr>\n<tr>\n<td>Product variation<\/td>\n<td>Are small color\/size\/SKU variants driving extra setup, stock, waste, or MOQ complexity?<\/td>\n<td>Consider order consolidation or staged variants while keeping each released product definition clear<\/td>\n<\/tr>\n<tr>\n<td>Inspection scope<\/td>\n<td>Is the check required to detect a meaningful risk or prove a customer\/compliance requirement?<\/td>\n<td>Improve the method or timing if appropriate; do not delete a needed control just to make a quote look lower<\/td>\n<\/tr>\n<tr>\n<td>Delivery schedule<\/td>\n<td>Does the requested lead time cause expediting, low efficiency, extra shifts, or freight cost?<\/td>\n<td>Discuss an achievable schedule and document the service-level effect<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>A preference can still be commercially important. The point is to name it as a preference rather than disguising it as a technical requirement. That gives the supplier a real chance to propose an option without guessing which features are sacred.<\/p>\n<h2>Ask where the cost is coming from, not only how much can be removed<\/h2>\n<p>A fact-based discussion is more useful than a demand for an arbitrary discount. aPriori describes should-cost analysis as examining material, process, labor, overhead, batch size, volume, tooling, and related production factors to create a benchmark for supplier discussion. <a href=\"https:\/\/www.apriori.com\/should-cost-analysis\/\" target=\"_blank\" rel=\"noopener\">3<\/a> A small buyer does not need formal cost-modeling software to use the basic idea: ask which specific conditions are creating the cost and what choices would change it.<\/p>\n<table>\n<thead>\n<tr>\n<th>Cost-driver question<\/th>\n<th>Why it helps<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>\u201cWhich three factors are driving this quote most?\u201d<\/td>\n<td>Encourages the supplier to describe the real commercial\/production constraints<\/td>\n<\/tr>\n<tr>\n<td>\u201cIs the cost primarily material, process time, labor, tooling\/setup, yield, packaging, testing, logistics, quantity, or another item?\u201d<\/td>\n<td>Separates possible levers instead of treating the total as one mystery number<\/td>\n<\/tr>\n<tr>\n<td>\u201cWhich cost drivers are fixed for this order, and which change with quantity or order pattern?\u201d<\/td>\n<td>Reveals whether a longer commitment, consolidated order, or different run plan is relevant<\/td>\n<\/tr>\n<tr>\n<td>\u201cWhat assumption did you make about the product revision, packaging, quality checks, and delivery?\u201d<\/td>\n<td>Finds scope differences before a negotiation turns into a quality issue<\/td>\n<\/tr>\n<tr>\n<td>\u201cCan you show options that preserve the listed non-negotiables?\u201d<\/td>\n<td>Establishes that cost options must be tied to the quality floor<\/td>\n<\/tr>\n<tr>\n<td>\u201cWhat evidence would confirm that the proposed option still meets the released requirement?\u201d<\/td>\n<td>Connects commercial discussion to verification<\/td>\n<\/tr>\n<tr>\n<td>\u201cWhat would need to change to reach this target, and what are the risks or limitations?\u201d<\/td>\n<td>Turns a requested price into a transparent trade-off discussion<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>The supplier may not disclose every internal cost detail, and a buyer should not assume a cost model is exact. aPriori notes that cost estimates are inherently imprecise and affected by changing market and production conditions. <a href=\"https:\/\/www.apriori.com\/should-cost-analysis\/\" target=\"_blank\" rel=\"noopener\">3<\/a> Use cost-driver questions to improve understanding\u2014not as proof that a factory must accept your target price.<\/p>\n<h2>Put cost ideas into a controlled option matrix<\/h2>\n<p>Do not let a supplier send a revised price with the phrase \u201csame quality\u201d as the only explanation. Ask for each proposal to be entered into a simple option matrix. The matrix makes the product, commercial, and verification effects visible side by side.<\/p>\n<table>\n<thead>\n<tr>\n<th>Option<\/th>\n<th>What changes<\/th>\n<th>What stays fixed<\/th>\n<th>Quote\/lead-time effect<\/th>\n<th>Quality\/compliance review needed<\/th>\n<th>Evidence before release<\/th>\n<th>Decision<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>A: Current baseline<\/td>\n<td>Nothing<\/td>\n<td>Full released configuration<\/td>\n<td>Current quote\/timing<\/td>\n<td>None beyond existing plan<\/td>\n<td>Existing sample\/inspection plan<\/td>\n<td>Baseline<\/td>\n<\/tr>\n<tr>\n<td>B: Order consolidation<\/td>\n<td>Quantity\/order pattern<\/td>\n<td>Product, material, acceptance criteria, and packaging rule<\/td>\n<td>Supplier to quote<\/td>\n<td>Confirm storage\/cash\/launch impact internally<\/td>\n<td>Updated quote and production plan<\/td>\n<td>Pending<\/td>\n<\/tr>\n<tr>\n<td>C: Packaging option<\/td>\n<td>Carton\/insert\/print detail<\/td>\n<td>Product protection, label requirements, count, and critical presentation needs<\/td>\n<td>Supplier to quote<\/td>\n<td>Packaging owner checks effect<\/td>\n<td>Physical proof\/photo\/sample plus stated checks<\/td>\n<td>Pending<\/td>\n<\/tr>\n<tr>\n<td>D: Process option<\/td>\n<td>Named production sequence or setup<\/td>\n<td>Released material, dimensions, function, appearance, and inspection criteria<\/td>\n<td>Supplier to quote<\/td>\n<td>Engineering\/quality review<\/td>\n<td>First-off or agreed verification evidence<\/td>\n<td>Pending<\/td>\n<\/tr>\n<tr>\n<td>E: Product-feature option<\/td>\n<td>Named product feature<\/td>\n<td>Listed non-negotiable function\/safety\/compliance items<\/td>\n<td>Supplier to quote<\/td>\n<td>Cross-functional review required<\/td>\n<td>Revised documents, prototype\/sample, and defined tests<\/td>\n<td>Pending<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>The matrix is not a legal agreement. It is a decision-control tool. It prevents the common failure mode where the buyer thinks the discussion was about a carton, while the supplier believes it was permission to change a component or process.<\/p>\n<h2>Use trade-offs that are visible and reversible where possible<\/h2>\n<p>The best cost conversation does not begin with a hidden reduction in product quality. It starts with options whose consequences are clear enough to evaluate.<\/p>\n<table>\n<thead>\n<tr>\n<th>Discussion area<\/th>\n<th>Quality-preserving direction to explore<\/th>\n<th>Guardrail<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Volume and order pattern<\/td>\n<td>Consolidate compatible variants, provide a more reliable forecast, or discuss repeat-order structure<\/td>\n<td>Do not commit to volume you cannot support; connect any commitment to the written quote\/terms<\/td>\n<\/tr>\n<tr>\n<td>SKU complexity<\/td>\n<td>Reduce unnecessary variation or align components across variants<\/td>\n<td>Verify that every remaining variant still meets its customer\/product requirement<\/td>\n<\/tr>\n<tr>\n<td>Embalaje<\/td>\n<td>Simplify noncritical packaging work or improve carton utilization<\/td>\n<td>Preserve product protection, required labels, count accuracy, and relevant retail\/customer requirements<\/td>\n<\/tr>\n<tr>\n<td>Design for manufacture<\/td>\n<td>Ask whether a noncritical geometry, assembly step, or finish is creating avoidable process difficulty<\/td>\n<td>The supplier must identify the exact design change; no \u201coptimization\u201d is approved without a revised document and verification plan<\/td>\n<\/tr>\n<tr>\n<td>Tooling\/setup<\/td>\n<td>Review cavity\/layout\/fixture\/setup alternatives appropriate to the forecast<\/td>\n<td>Keep tool\/product revision, capability, trial evidence, and maintenance\/change implications documented<\/td>\n<\/tr>\n<tr>\n<td>Inspection efficiency<\/td>\n<td>Improve how data is collected, where a check occurs, or how a stable requirement is verified<\/td>\n<td>Do not eliminate a control that is needed for the risk, contract, customer, or compliance requirement<\/td>\n<\/tr>\n<tr>\n<td>Logistics planning<\/td>\n<td>Combine shipments or align readiness windows where operationally sensible<\/td>\n<td>Do not change delivery\/Incoterms\/packing assumptions without clear commercial and logistics approval<\/td>\n<\/tr>\n<tr>\n<td>Payment\/term structure<\/td>\n<td>Discuss commercial timing separately from product configuration<\/td>\n<td>Never treat a payment concession as authority to lower material, testing, or inspection requirements<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>IBM lists areas such as standardization, order consolidation, process improvement, better data, and supplier relationship management as possible long-term procurement cost levers. <a href=\"https:\/\/www.ibm.com\/think\/insights\/procurement-cost-reduction-strategies\" target=\"_blank\" rel=\"noopener\">1<\/a> Whether a particular option makes sense depends on your product, supplier, cash flow, service promise, and risk controls. The table is a discussion map, not a recommendation to make any specific trade-off.<\/p>\n<h2>Protect the quote from invisible substitutions<\/h2>\n<p>A supplier may be able to reduce cost legitimately. The buyer still needs to know whether the revised quote carries the same scope. Review the revision line by line.<\/p>\n<table>\n<thead>\n<tr>\n<th>Quote and scope check<\/th>\n<th>What to compare<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Product identity<\/td>\n<td>SKU, part number, model, size\/color\/variant, drawing\/BOM\/artwork revision<\/td>\n<\/tr>\n<tr>\n<td>Material and component<\/td>\n<td>Grade, supplier\/source where controlled, specification, finish, accessory, and any listed alternative<\/td>\n<\/tr>\n<tr>\n<td>Process and tooling<\/td>\n<td>Process assumption, fixture\/mold\/die status, setup, manual\/automated operation, and trial work<\/td>\n<\/tr>\n<tr>\n<td>Quality controls<\/td>\n<td>Inspection checkpoints, functional test, appearance reference, sample plan where applicable, report, and release condition<\/td>\n<\/tr>\n<tr>\n<td>Embalaje<\/td>\n<td>Inner pack, carton, inserts, protection, labels, print\/artwork revision, count, and palletization where relevant<\/td>\n<\/tr>\n<tr>\n<td>Quantity and price basis<\/td>\n<td>MOQ, unit price, currency, volume tier, scrap\/yield assumption if stated, and validity period<\/td>\n<\/tr>\n<tr>\n<td>Timing and delivery<\/td>\n<td>Lead time, production date assumptions, shipment readiness, delivery term, and freight inclusion\/exclusion<\/td>\n<\/tr>\n<tr>\n<td>Exclusions<\/td>\n<td>Testing, certificates, tooling, samples, packaging changes, logistics, duties\/taxes, rework, storage, or other chargeable items<\/td>\n<\/tr>\n<tr>\n<td>Change statement<\/td>\n<td>A plain-language list of what is different from the previous quote and which documents replace prior versions<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Article 43, <a href=\"https:\/\/sourcingall.com\/es\/sourcing-basics\/what-supplier-quote-should-include\/\">What Should a Supplier Quote Include?<\/a>, covers the core quote fields. Article 47 adds one rule: when negotiating cost, compare the revised quote to the released quality floor, not merely to the prior unit price.<\/p>\n<h2>Turn an agreed option into a controlled product change<\/h2>\n<p>If an option alters any product, material, process, packaging, or quality-control assumption, it is not fully agreed because the supplier said \u201cokay.\u201d It needs a controlled release.<\/p>\n<table>\n<thead>\n<tr>\n<th>Change-control step<\/th>\n<th>Required record<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Identify baseline<\/td>\n<td>Current quote, product documents, approved sample\/reference, inspection plan, and open issues<\/td>\n<\/tr>\n<tr>\n<td>Describe proposed change<\/td>\n<td>Old\/new condition, reason, supplier proposal, affected product\/SKU\/order, and commercial effect<\/td>\n<\/tr>\n<tr>\n<td>Assess effect<\/td>\n<td>Function, fit, appearance, material, safety\/compliance responsibility, packaging, tooling\/process, timeline, and cost effect<\/td>\n<\/tr>\n<tr>\n<td>Define verification<\/td>\n<td>Sample\/first-off, dimensional\/functional\/appearance check, test, inspection, evidence format, and acceptance owner<\/td>\n<\/tr>\n<tr>\n<td>Update documents<\/td>\n<td>Revised drawing\/BOM\/artwork\/specification\/quote\/PO\/inspection checklist as appropriate<\/td>\n<\/tr>\n<tr>\n<td>Approve or reject<\/td>\n<td>Named authorized decision owner and date; no implied approval from silence<\/td>\n<\/tr>\n<tr>\n<td>Release to production<\/td>\n<td>Stated effective order\/lot\/date and retired-version handling<\/td>\n<\/tr>\n<tr>\n<td>Confirm in production<\/td>\n<td>Required checkpoint, evidence, issue record, and final disposition<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>For the broader revision process, see <a href=\"https:\/\/sourcingall.com\/es\/sourcing-basics\/manage-product-revisions-control-quote\/\">How to Manage Product Revisions Without Losing Control of the Quote<\/a>. If the change reaches production, apply the order-specific evidence approach in <a href=\"https:\/\/sourcingall.com\/es\/sourcing-basics\/quality-control-custom-products\/\">Quality Control for Custom Products: What Changes When Every Order Is Different<\/a>.<\/p>\n<h2>Negotiate the relationship and the record at the same time<\/h2>\n<p>Good commercial pressure does not require vague threats or false competitive claims. Art of Procurement recommends preparation, objective criteria, ethical negotiation, clear scope\/deliverables, and documentation of agreements. <a href=\"https:\/\/artofprocurement.com\/blog\/supplier-negotiations-in-strategic-sourcing\" target=\"_blank\" rel=\"noopener\">2<\/a> Those habits also protect quality because they reduce the chance that a factory fills a missing decision with its own assumption.<\/p>\n<p>Here is a concise message structure:<\/p>\n<blockquote>\n<p>We want to explore cost reduction while keeping the attached non-negotiable requirements unchanged: [list]. Please identify the main cost drivers in your current quotation and propose options in a table. For each option, show exactly what changes, what remains unchanged, price\/lead-time effect, any tooling\/setup impact, and the sample\/test\/inspection evidence needed before production. Please do not substitute material, component, process, packaging, or quality-control requirement unless the change is separately identified and approved in writing.<\/p>\n<\/blockquote>\n<p>The message is firm without accusing the supplier of overpricing. It invites operational ideas while making silent substitution unacceptable.<\/p>\n<h2>Watch for warning signs<\/h2>\n<p>A cost proposal needs more review when it removes information rather than explaining a trade-off.<\/p>\n<table>\n<thead>\n<tr>\n<th>Warning sign<\/th>\n<th>Better response<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>\u201cSame quality, lower price\u201d with no listed difference<\/td>\n<td>Ask for a documented option matrix and revised quote scope<\/td>\n<\/tr>\n<tr>\n<td>Material or component description disappears from the new quote<\/td>\n<td>Ask whether it changed, what is proposed, and which document controls it<\/td>\n<\/tr>\n<tr>\n<td>Supplier says inspection is \u201cnot necessary\u201d after a price discussion<\/td>\n<td>Revisit the risk\/acceptance requirement and improve efficiency only if the control objective is still met<\/td>\n<\/tr>\n<tr>\n<td>Price is lower but quantity, lead time, packaging, or delivery basis changed<\/td>\n<td>Normalize the quote comparison before deciding<\/td>\n<\/tr>\n<tr>\n<td>Supplier asks for verbal approval to \u201coptimize\u201d a process<\/td>\n<td>Require a written proposal, effect assessment, evidence plan, and authorized release<\/td>\n<\/tr>\n<tr>\n<td>Sample looks acceptable but documentation still refers to the old version<\/td>\n<td>Align product documents, quote, sample ID, and inspection criteria before production<\/td>\n<\/tr>\n<tr>\n<td>Supplier resists explaining any assumption<\/td>\n<td>Decide whether the remaining uncertainty is acceptable; do not manufacture certainty from an incomplete quote<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>A warning sign does not prove bad intent. It indicates that the buyer needs a clearer record before accepting the saving.<\/p>\n<h2>Final negotiation checklist<\/h2>\n<p>Before accepting a lower price, confirm:<\/p>\n<ol>\n<li>The current quality floor is written and linked to the correct product\/packaging revision.<\/li>\n<li>Must-haves and flexible preferences are clearly separated.<\/li>\n<li>The supplier has identified the cost driver or commercial condition behind each option.<\/li>\n<li>The chosen option states what changes and what does not change.<\/li>\n<li>Unit price, quantity, currency, tooling\/setup, lead time, packaging, testing, freight, and exclusions are checked on the revised quote.<\/li>\n<li>Any material, component, process, packaging, inspection, or product change has a defined verification plan and decision owner.<\/li>\n<li>The revised product documents, quote\/PO, sample\/first-off evidence, and inspection controls tell the same story.<\/li>\n<li>No payment, volume, or schedule concession has been treated as permission to lower a quality requirement.<\/li>\n<\/ol>\n<p>A good negotiation does not ask a supplier to absorb impossible economics. It identifies what the product genuinely needs, explores the cost of meeting those needs, and controls every approved alternative. That is how a buyer can pursue a better price without accidentally buying a different product.<\/p>\n<h2>Referencias<\/h2>\n<ol>\n<li><a href=\"https:\/\/www.ibm.com\/think\/insights\/procurement-cost-reduction-strategies\" target=\"_blank\" rel=\"noopener\">IBM, <em>Procurement Cost Reduction Strategies<\/em><\/a><\/li>\n<li><a href=\"https:\/\/artofprocurement.com\/blog\/supplier-negotiations-in-strategic-sourcing\" target=\"_blank\" rel=\"noopener\">Art of Procurement, <em>Tips for Successful Supplier Negotiations in Strategic Sourcing<\/em><\/a><\/li>\n<li><a href=\"https:\/\/www.apriori.com\/should-cost-analysis\/\" target=\"_blank\" rel=\"noopener\">aPriori, <em>A Guide to Should Cost Analysis and Negotiation<\/em><\/a><\/li>\n<\/ol>","protected":false},"excerpt":{"rendered":"<p>\u201cCan you make it cheaper?\u201d is a normal sourcing question. It becomes dangerous when neither side says what must change [&hellip;]<\/p>","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"rank_math_internal_links_processed":["1"],"rank_math_title":["Negotiate Cost Without Lowering Your Quality Standard"],"rank_math_description":["Negotiate supplier cost without compromising quality: protect key requirements, discuss cost drivers, control changes, and verify approved options."],"rank_math_focus_keyword":["negotiate quality supplier"],"rank_math_rich_snippet":["article"],"_rank_math_rich_snippet":["article"],"rank_math_schema_Article":["a:2:{s:5:\"@type\";s:7:\"Article\";s:8:\"headline\";s:55:\"How to Negotiate Without Lowering Your Quality Standard\";}"],"_rank_math_schema_Article":["a:2:{s:5:\"@type\";s:7:\"Article\";s:8:\"headline\";s:55:\"How to Negotiate Without Lowering Your Quality Standard\";}"],"_uag_page_assets":["a:9:{s:3:\"css\";s:263:\".uag-blocks-common-selector{z-index:var(--z-index-desktop) !important}@media (max-width: 976px){.uag-blocks-common-selector{z-index:var(--z-index-tablet) !important}}@media (max-width: 767px){.uag-blocks-common-selector{z-index:var(--z-index-mobile) !important}}\n\";s:2:\"js\";s:0:\"\";s:18:\"current_block_list\";a:15:{i:0;s:11:\"core\/search\";i:1;s:10:\"core\/group\";i:2;s:12:\"core\/heading\";i:3;s:17:\"core\/latest-posts\";i:4;s:20:\"core\/latest-comments\";i:5;s:13:\"core\/archives\";i:6;s:15:\"core\/categories\";i:8;s:25:\"greenshift-blocks\/heading\";i:9;s:22:\"greenshift-blocks\/text\";i:10;s:14:\"core\/paragraph\";i:12;s:18:\"core\/legacy-widget\";i:13;s:17:\"core\/social-links\";i:15;s:16:\"core\/social-link\";i:16;s:21:\"trp\/language-switcher\";i:17;s:9:\"core\/html\";}s:8:\"uag_flag\";b:0;s:11:\"uag_version\";s:10:\"1787368271\";s:6:\"gfonts\";a:0:{}s:10:\"gfonts_url\";s:0:\"\";s:12:\"gfonts_files\";a:0:{}s:14:\"uag_faq_layout\";b:0;}"],"_uag_css_file_name":["uag-css-2438.css"]},"categories":[32],"tags":[],"class_list":["post-2438","post","type-post","status-publish","format-standard","hentry","category-sourcing-basics"],"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"trp-custom-language-flag":false},"uagb_author_info":{"display_name":"admin","author_link":"https:\/\/sourcingall.com\/es\/author\/admin\/"},"uagb_comment_info":0,"uagb_excerpt":"\u201cCan you make it cheaper?\u201d is a normal sourcing question. It becomes dangerous when neither side says what must change [&hellip;]","_links":{"self":[{"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/posts\/2438","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/comments?post=2438"}],"version-history":[{"count":1,"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/posts\/2438\/revisions"}],"predecessor-version":[{"id":2645,"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/posts\/2438\/revisions\/2645"}],"wp:attachment":[{"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/media?parent=2438"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/categories?post=2438"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/tags?post=2438"}],"curies":[{"name":"gracias","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}