{"id":2416,"date":"2026-08-18T14:00:43","date_gmt":"2026-08-18T06:00:43","guid":{"rendered":"https:\/\/sourcingall.com\/sourcing-basics\/how-to-reduce-sample-to-production-differences\/"},"modified":"2026-08-21T15:45:57","modified_gmt":"2026-08-21T07:45:57","slug":"how-to-reduce-sample-to-production-differences","status":"publish","type":"post","link":"https:\/\/sourcingall.com\/es\/sourcing-basics\/how-to-reduce-sample-to-production-differences\/","title":{"rendered":"How to Reduce Sample-to-Production Differences"},"content":{"rendered":"<p>The sample looked right. The bulk order did not. That result is rarely fixed by looking harder at the finished cartons.<\/p>\n<p>A gap between a sample and production usually starts earlier: a requirement was never written down, a component changed, a process setting drifted, a factory team used an old file, or nobody checked the first real production output against the approved standard. Final inspection can find some of those issues, but it cannot undo every decision that created them. QualityInspection.org describes end-of-line inspection as reactive and recommends building controls into the product-development and production-start process. <a href=\"https:\/\/qualityinspection.org\/what-qc-processes-should-be-set-up-before-mass-production\/\" target=\"_blank\" rel=\"noopener\">1<\/a><\/p>\n<p>The aim is not to create a huge quality manual for every product. It is to turn the sample, the written requirements, and the factory process into one controlled system. This guide shows how to do that before and during production.<\/p>\n<h2>Start with the right expectation<\/h2>\n<p>An approved sample is important. It is not a promise that every unit will match it automatically.<\/p>\n<p>A golden sample gives the buyer, factory, and inspection team a physical point of comparison. It cannot by itself record every component specification, measurement tolerance, test method, permitted variation, or process setting. Sofeast makes that limitation explicit: the reference sample should work alongside specifications, bills of materials, tolerances, test requirements, process controls, pilot validation, and inspection. <a href=\"https:\/\/www.sofeast.com\/glossary\/golden-sample\/\" target=\"_blank\" rel=\"noopener\">2<\/a><\/p>\n<p>Before you build a control plan, make sure you know which sample you approved and what it was meant to represent. The article <a href=\"https:\/\/sourcingall.com\/es\/sourcing-basics\/golden-sample-vs-production-sample\/\">Golden Sample vs Production Sample: Why the Difference Matters<\/a> explains how to separate a final approval reference from a sample that merely shows a current production result.<\/p>\n<h2>Release one controlled production package<\/h2>\n<p>The factory should not be working from a mix of chat messages, an old PDF, a photo in a group conversation, and someone\u2019s memory of what was said during a call.<\/p>\n<p>Before mass production starts, issue one controlled package. QualityInspection.org says that a sample alone is not sufficient to establish the standard and recommends written inspection criteria, sample approval, finalized technical data, and a quality control plan for more complex work. <a href=\"https:\/\/qualityinspection.org\/pre-production-china-ppap\/\" target=\"_blank\" rel=\"noopener\">3<\/a><\/p>\n<table>\n<thead>\n<tr>\n<th>Control item<\/th>\n<th>What it prevents<\/th>\n<th>Minimum content<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Approved sample record<\/td>\n<td>Arguments over which physical item is current<\/td>\n<td>Sample ID, product version, approval date, photos, owner, and storage location<\/td>\n<\/tr>\n<tr>\n<td>Product specification<\/td>\n<td>Unwritten expectations and subjective interpretation<\/td>\n<td>Materials, dimensions, color, finish, function, packaging, labels, and acceptance points<\/td>\n<\/tr>\n<tr>\n<td>BOM or component list<\/td>\n<td>Silent substitution of visible or hidden parts<\/td>\n<td>Component name, model or grade, quantity, approved alternative rule, and revision<\/td>\n<\/tr>\n<tr>\n<td>Drawings and tolerances<\/td>\n<td>Measuring the wrong point or accepting an undefined variation<\/td>\n<td>Critical dimensions, measurement location, acceptable range, and units<\/td>\n<\/tr>\n<tr>\n<td>Quality checklist<\/td>\n<td>Different teams checking different features<\/td>\n<td>What to inspect, method, frequency or stage, acceptance rule, and record required<\/td>\n<\/tr>\n<tr>\n<td>Reference-photo pack<\/td>\n<td>Misunderstanding of visual features<\/td>\n<td>Approved views, close-ups, label position, pack-out, and examples of any permitted variation<\/td>\n<\/tr>\n<tr>\n<td>Change log<\/td>\n<td>Production against an old version<\/td>\n<td>Change ID, reason, impact, approval, effective date, and replacement files<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Use the <a href=\"https:\/\/sourcingall.com\/es\/sourcing-basics\/product-specification-sheet-china-manufacturing\/\">Product Specification Sheet Template for China Manufacturing<\/a> as the main product record. The goal is not to make the sheet long. The goal is to make the current version impossible to miss.<\/p>\n<p>Give the package an ID and revision, such as <code>SPEC-TB-500 Rev C<\/code>. Put that revision on the purchase order, the sample record, the drawings, the checklist, and the email that authorizes production. Ask the supplier to confirm in writing that this is the version released to the responsible production and quality staff.<\/p>\n<h2>Convert \u201cmatch the sample\u201d into checkable points<\/h2>\n<p>The sentence \u201cmatch the approved sample\u201d is useful, but it is too broad to manage a line.<\/p>\n<p>Break the product into the points that can change during production. Which of those points would make the item unacceptable if they drift? Which can vary within a stated range? Which must be checked before materials are consumed, before assembly, or before packing?<\/p>\n<table>\n<thead>\n<tr>\n<th>Product area<\/th>\n<th>Weak instruction<\/th>\n<th>Better controlled instruction<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Material<\/td>\n<td>\u201cUse good fabric.\u201d<\/td>\n<td>\u201cUse the approved fabric code and weight stated in BOM Rev C; no alternative without written approval.\u201d<\/td>\n<\/tr>\n<tr>\n<td>Color<\/td>\n<td>\u201cMatch the blue sample.\u201d<\/td>\n<td>\u201cCompare finished body against approved reference under the agreed viewing condition; any variation outside the approved photo range requires review.\u201d<\/td>\n<\/tr>\n<tr>\n<td>Dimension<\/td>\n<td>\u201cMake it the same size.\u201d<\/td>\n<td>\u201cMeasure finished width at the marked points; record the result against the stated tolerance.\u201d<\/td>\n<\/tr>\n<tr>\n<td>Assembly<\/td>\n<td>\u201cThe lid should fit.\u201d<\/td>\n<td>\u201cCheck lid engagement and seal using the defined test method before pack-out.\u201d<\/td>\n<\/tr>\n<tr>\n<td>Print or logo<\/td>\n<td>\u201cLogo in the usual place.\u201d<\/td>\n<td>\u201cUse ART-TB-500 Rev B; check logo position and legibility against the marked reference image.\u201d<\/td>\n<\/tr>\n<tr>\n<td>Embalaje<\/td>\n<td>\u201cPack carefully.\u201d<\/td>\n<td>\u201cUse the approved insert and carton pack-out; verify unit count, label version, and carton mark before release.\u201d<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>This translation from a preference into a check does not require a formal engineering department. It requires a buyer to name the feature, the reference, the way it will be checked, and what happens if it does not match.<\/p>\n<p>QualityInspection.org describes a quality control plan as a record that can cover product and process characteristics, measurement methods, equipment, control methods, and response plans. <a href=\"https:\/\/qualityinspection.org\/pre-production-china-ppap\/\" target=\"_blank\" rel=\"noopener\">3<\/a> For a lower-complexity item, a short supplier-facing checklist may cover the same practical ground.<\/p>\n<h2>Ask the factory to identify the production risks before the line starts<\/h2>\n<p>The factory understands its process better than a buyer looking at the finished sample. Use that knowledge before production, not after a defect appears.<\/p>\n<p>Ask the supplier\u2019s technical or quality contact to review the released package and identify which points are most likely to change during production. The answer may involve material variation, mold behavior, printing alignment, plating color, sewing, assembly fit, curing time, packing, or another product-specific step.<\/p>\n<table>\n<thead>\n<tr>\n<th>Ask the supplier<\/th>\n<th>Why it matters<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Which critical features need a first-piece check?<\/td>\n<td>It shows where an early mistake could affect many units.<\/td>\n<\/tr>\n<tr>\n<td>Which material or component substitutions might be proposed?<\/td>\n<td>It puts an approval stop before the substitution happens.<\/td>\n<\/tr>\n<tr>\n<td>Which measurements or tests can the line record?<\/td>\n<td>It links the requirement to a usable check.<\/td>\n<\/tr>\n<tr>\n<td>Which process step is most sensitive to variation?<\/td>\n<td>It focuses attention where the approved result is easiest to lose.<\/td>\n<\/tr>\n<tr>\n<td>What will the supplier do if a result is outside the stated acceptance point?<\/td>\n<td>It creates a response path before there is pressure to ship.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>This is not an invitation to transfer responsibility to the supplier. It is a way to find assumptions while there is still time to change the plan. QualityInspection.org recommends defining requirements, qualifying suppliers and components, planning incoming and in-process controls, preparing inspection and testing methods, reviewing process risks, and using pilot runs before mass production. <a href=\"https:\/\/qualityinspection.org\/what-qc-processes-should-be-set-up-before-mass-production\/\" target=\"_blank\" rel=\"noopener\">1<\/a><\/p>\n<h2>Use a production-intent pilot, not only a sample-room result<\/h2>\n<p>A sample room can make one good item. A production process has to make the item repeatedly with the actual tool, equipment, components, people, and work sequence intended for the order.<\/p>\n<p>For a new, customized, or risk-sensitive product, ask for a pilot run or an equivalent early-production validation step. QualityInspection.org says a production pilot should use production tooling and relevant equipment, ideally with the same components planned for mass production. It can provide evidence for reviewing process instructions and validating products before final sign-off. <a href=\"https:\/\/qualityinspection.org\/pre-production-china-ppap\/\" target=\"_blank\" rel=\"noopener\">3<\/a><\/p>\n<p>You do not need to prescribe a universal pilot quantity in an article or in a supplier email. The right scale depends on the product and process. You do need to agree what the pilot must answer.<\/p>\n<table>\n<thead>\n<tr>\n<th>Pilot question<\/th>\n<th>Evidence to request or review<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Does the product still match the approved reference?<\/td>\n<td>Side-by-side photos, measurements, and functional results for the defined critical points<\/td>\n<\/tr>\n<tr>\n<td>Are final materials and components in use?<\/td>\n<td>Material and component confirmation tied to the released BOM<\/td>\n<\/tr>\n<tr>\n<td>Can the process hold the required features?<\/td>\n<td>First-piece and early-run checks using the stated method<\/td>\n<\/tr>\n<tr>\n<td>Are work instructions usable?<\/td>\n<td>Supplier confirmation plus any needed corrections to the instruction or fixture<\/td>\n<\/tr>\n<tr>\n<td>Does packaging still protect and identify the product correctly?<\/td>\n<td>Pack-out photos, label and carton-mark checks, and any required handling test evidence<\/td>\n<\/tr>\n<tr>\n<td>Are there open differences?<\/td>\n<td>Numbered deviation list with owner, decision, and next action<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>If the pilot exposes a gap, treat it as information, not a reason to quietly downgrade the standard. Decide whether the product, process, acceptance point, price, or timing must change. Then update the controlled package before the line moves forward.<\/p>\n<h2>Check production readiness before materials turn into finished goods<\/h2>\n<p>A pre-production check is not the same as a final inspection. It asks whether the factory is ready to start against the agreed standard.<\/p>\n<p>InTouch Quality describes pre-production inspection as a way to identify quality risks before manufacturing. Its listed checks include material status and condition, production readiness, factory facilities and machinery, and measuring or testing equipment. <a href=\"https:\/\/www.intouch-quality.com\/blog\/the-importance-of-a-pre-production-inspection\" target=\"_blank\" rel=\"noopener\">4<\/a><\/p>\n<p>For an in-house review, a sourcing team can use the same logic:<\/p>\n<ol>\n<li><strong>Confirm the current documents and sample ID.<\/strong> The production floor should have the released version, not a draft or superseded sample.<\/li>\n<li><strong>Confirm raw materials and components.<\/strong> Check whether they match the released BOM or whether any deviation has been proposed.<\/li>\n<li><strong>Confirm tools, fixtures, and test equipment.<\/strong> The checks in your plan must be possible on the actual line.<\/li>\n<li><strong>Review the first completed units.<\/strong> Compare them with the physical reference and written criteria before normal output accumulates.<\/li>\n<li><strong>Record the result and decision.<\/strong> If a critical point fails, do not let a verbal promise become the only corrective action.<\/li>\n<\/ol>\n<p>When production capacity is uncertain, add a capacity check rather than assuming the same line and controls can support the quantity and schedule. See <a href=\"https:\/\/sourcingall.com\/es\/sourcing-basics\/check-supplier-production-capacity\/\">How to Check a Supplier\u2019s Production Capacity<\/a> for the separate due-diligence process.<\/p>\n<h2>Create an early-production feedback loop<\/h2>\n<p>The most useful time to find a production difference is when it can still be contained.<\/p>\n<p>Ask for a small set of early-production evidence tied to the controls you agreed. That may include first-piece photos, measurement records, functional test results, material labels, process-check records, or a video of a relevant assembly test. The evidence should match the product\u2019s risks. A decorative item may need strong visual comparison. A functional item may need a documented function check. A fit-critical item may need measurement evidence.<\/p>\n<table>\n<thead>\n<tr>\n<th>When you see a difference<\/th>\n<th>First question to ask<\/th>\n<th>Controlled next step<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>The result differs from the approved sample<\/td>\n<td>Is the difference permitted in the current written standard?<\/td>\n<td>If yes, record it. If no, classify it as a deviation and stop treating it as approved.<\/td>\n<\/tr>\n<tr>\n<td>A material or component is different<\/td>\n<td>Was the substitution proposed and approved in writing?<\/td>\n<td>Compare against the BOM and change record; do not accept a verbal equivalence claim alone.<\/td>\n<\/tr>\n<tr>\n<td>A dimension is outside the stated range<\/td>\n<td>Was the measurement point and method used correctly?<\/td>\n<td>Recheck against the defined method, then investigate the process or tooling cause.<\/td>\n<\/tr>\n<tr>\n<td>A visual feature looks inconsistent<\/td>\n<td>Is there a photo reference or defect boundary that explains the acceptable range?<\/td>\n<td>Add a controlled visual record or clarify the acceptance point before more units are accepted.<\/td>\n<\/tr>\n<tr>\n<td>The supplier says the issue will be fixed in bulk<\/td>\n<td>Has the correction been proven on a new controlled first piece?<\/td>\n<td>Ask for evidence from the corrected process, then record the new result.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Do not use the feedback loop to create a parallel chat-based specification. If the issue changes the product requirement or what is acceptable, update the controlled record and tell every relevant party which revision now applies.<\/p>\n<h2>Stop unapproved changes from becoming production facts<\/h2>\n<p>Production differences are often introduced as reasonable-sounding changes: \u201cthe usual material was unavailable,\u201d \u201cthis color is close,\u201d \u201cwe improved the process,\u201d or \u201cthe original component costs more.\u201d Some changes may be workable. None should rewrite the order by accident.<\/p>\n<p>QualityInspection.org notes that change control creates a revision history and helps stop the wrong parts from being made against a previous specification. <a href=\"https:\/\/qualityinspection.org\/pre-production-china-ppap\/\" target=\"_blank\" rel=\"noopener\">3<\/a> Use a simple stop-rule:<\/p>\n<blockquote>\n<p><strong>If a change can affect the product\u2019s material, component, dimension, appearance, function, packaging, test result, cost, lead time, or acceptance point, it requires written review before it is treated as part of production.<\/strong><\/p>\n<\/blockquote>\n<table>\n<thead>\n<tr>\n<th>Change record field<\/th>\n<th>What to capture<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Change ID and date<\/td>\n<td>A visible identifier for the decision<\/td>\n<\/tr>\n<tr>\n<td>Current and proposed item<\/td>\n<td>The old and new material, component, drawing, artwork, process, or pack-out<\/td>\n<\/tr>\n<tr>\n<td>Reason<\/td>\n<td>Supplier explanation of why the change is needed<\/td>\n<\/tr>\n<tr>\n<td>Impact review<\/td>\n<td>What could change in appearance, fit, function, price, timing, testing, or inspection<\/td>\n<\/tr>\n<tr>\n<td>Evidence<\/td>\n<td>Revised sample, comparison photos, measurement, test result, or technical document<\/td>\n<\/tr>\n<tr>\n<td>Decision<\/td>\n<td>Approved, rejected, or more information required<\/td>\n<\/tr>\n<tr>\n<td>Effective point<\/td>\n<td>Which batch, date, file revision, or sample ID becomes valid<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>If the change concerns a certificate, test report, declaration, or a marked product configuration, verify that the document still applies to the exact item after the change. The guide <a href=\"https:\/\/sourcingall.com\/es\/sourcing-basics\/verify-product-certificates-supplier\/\">How to Verify Product Certificates Without Relying on a PDF<\/a> explains why an apparently familiar document should be checked for product, issuer, and scope match.<\/p>\n<h2>Keep final inspection in its proper role<\/h2>\n<p>Final inspection still matters. It can provide an independent check of finished goods and document whether the output matches the defined criteria. It should not be the first time the buyer discovers what the production team is making.<\/p>\n<p>The stronger sequence is: define the standard, release the correct documents, validate production intent, check readiness, compare early output, control changes, and then inspect finished goods against the same reference set. That sequence does not guarantee a perfect order. It gives you more chances to find a mismatch while the cause is still visible and the affected quantity may be smaller.<\/p>\n<h2>The practical rule<\/h2>\n<p>To reduce sample-to-production differences, do not rely on the sample alone. Turn it into a controlled reference, attach it to a current specification and component record, prove the real process with an early validation step, check the start of production, and require written decisions for changes.<\/p>\n<p>When the factory, buyer, and quality team are all checking the same version of the same requirements, a production difference becomes a specific issue to resolve rather than a vague argument about what the product was supposed to be.<\/p>\n<h2>Referencias<\/h2>\n<ol>\n<li><a href=\"https:\/\/qualityinspection.org\/what-qc-processes-should-be-set-up-before-mass-production\/\" target=\"_blank\" rel=\"noopener\">QualityInspection.org, <em>What QC Processes Should Be Set Up Before Mass Production?<\/em><\/a><\/li>\n<li><a href=\"https:\/\/www.sofeast.com\/glossary\/golden-sample\/\" target=\"_blank\" rel=\"noopener\">Sofeast, <em>Golden Sample in Manufacturing<\/em><\/a><\/li>\n<li><a href=\"https:\/\/qualityinspection.org\/pre-production-china-ppap\/\" target=\"_blank\" rel=\"noopener\">QualityInspection.org, <em>What Needs to Be Done Before Production Starts (PPAP)<\/em><\/a><\/li>\n<li><a href=\"https:\/\/www.intouch-quality.com\/blog\/the-importance-of-a-pre-production-inspection\" target=\"_blank\" rel=\"noopener\">InTouch Quality, <em>The Importance of a Pre-Production Inspection<\/em><\/a><\/li>\n<\/ol>","protected":false},"excerpt":{"rendered":"<p>The sample looked right. The bulk order did not. That result is rarely fixed by looking harder at the finished [&hellip;]<\/p>","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"rank_math_internal_links_processed":["1"],"rank_math_title":["How to Reduce Sample-to-Production Differences"],"rank_math_description":["Reduce sample-to-production differences with controlled specifications, pilot runs, early checks, change control, and clear factory quality records."],"rank_math_focus_keyword":["sample to production quality"],"rank_math_rich_snippet":["article"],"_rank_math_rich_snippet":["article"],"rank_math_schema_Article":["a:2:{s:5:\"@type\";s:7:\"Article\";s:8:\"headline\";s:46:\"How to Reduce Sample-to-Production Differences\";}"],"_rank_math_schema_Article":["a:2:{s:5:\"@type\";s:7:\"Article\";s:8:\"headline\";s:46:\"How to Reduce Sample-to-Production Differences\";}"],"_uag_page_assets":["a:9:{s:3:\"css\";s:263:\".uag-blocks-common-selector{z-index:var(--z-index-desktop) !important}@media (max-width: 976px){.uag-blocks-common-selector{z-index:var(--z-index-tablet) !important}}@media (max-width: 767px){.uag-blocks-common-selector{z-index:var(--z-index-mobile) !important}}\n\";s:2:\"js\";s:0:\"\";s:18:\"current_block_list\";a:15:{i:0;s:11:\"core\/search\";i:1;s:10:\"core\/group\";i:2;s:12:\"core\/heading\";i:3;s:17:\"core\/latest-posts\";i:4;s:20:\"core\/latest-comments\";i:5;s:13:\"core\/archives\";i:6;s:15:\"core\/categories\";i:8;s:25:\"greenshift-blocks\/heading\";i:9;s:22:\"greenshift-blocks\/text\";i:10;s:14:\"core\/paragraph\";i:12;s:18:\"core\/legacy-widget\";i:13;s:17:\"core\/social-links\";i:15;s:16:\"core\/social-link\";i:16;s:21:\"trp\/language-switcher\";i:17;s:9:\"core\/html\";}s:8:\"uag_flag\";b:0;s:11:\"uag_version\";s:10:\"1787368271\";s:6:\"gfonts\";a:0:{}s:10:\"gfonts_url\";s:0:\"\";s:12:\"gfonts_files\";a:0:{}s:14:\"uag_faq_layout\";b:0;}"],"_uag_css_file_name":["uag-css-2416.css"]},"categories":[32],"tags":[],"class_list":["post-2416","post","type-post","status-publish","format-standard","hentry","category-sourcing-basics"],"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"trp-custom-language-flag":false},"uagb_author_info":{"display_name":"admin","author_link":"https:\/\/sourcingall.com\/es\/author\/admin\/"},"uagb_comment_info":0,"uagb_excerpt":"The sample looked right. The bulk order did not. That result is rarely fixed by looking harder at the finished [&hellip;]","_links":{"self":[{"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/posts\/2416","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/comments?post=2416"}],"version-history":[{"count":1,"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/posts\/2416\/revisions"}],"predecessor-version":[{"id":2667,"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/posts\/2416\/revisions\/2667"}],"wp:attachment":[{"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/media?parent=2416"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/categories?post=2416"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sourcingall.com\/es\/wp-json\/wp\/v2\/tags?post=2416"}],"curies":[{"name":"gracias","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}